2555–2557 Mission Street
Mission · San Francisco, CA 94110
Permit history
-
Apr 1986
Installation of plumbing, electrical, air conditioning.
-
May 1986
Install air cond.in existing building.
-
Dec 1986
Electric - new inside service - lights, plugs.
-
May 1987
Fabricate & install awning.
-
Nov 1991
Erect a two story offices/coml structure.
-
May 1993
Errect barricade at entrance.
-
May 1994
On north & south sides of building demol dsamaged parapet.
-
Nov 1996
Convert theater into office sp, new handicap rest, evevator, dr.
-
May 2000
Non-illuminated, non-electric, painted wall.
-
Jun 2001
Renovation of existing theater to establish a helath fitness facility, level existing sloping grnd, horiz. ext.
-
Aug 2001
Demolishpartial basemenmt, ground fl, demolition g/f structural.
-
Sep 2001
Parapet safety program, parapet walls/ roof ties.
-
Dec 2005
Renewal permit application 2001/06/13/1442s2 (foundation, excavation, underpionning, retaining walls, grading).
-
Aug 2007
Non-electric wall mounted single faced sign - 7'x16' on mission street.
-
Apr 2009
To complete work amd obtain final inspection for work approved permit application 2001/06/13/1442 (remainder of work).
-
Jul 2009
Demolition and bracing/shoring to prepare site for execution of approved superstructure. scope of work and change of use under appl. 200106131442 s-3. (interior work only).
-
Mar 2014
To complete and finalize work approved under permit application 200106131442.
-
Mar 2015
Install fire sprinkler system through-out entire building with class 1 standpipe system to nfpa 13 & 14-2013. renovate existing 4" fire service. provide property line window speaker protection 200106131442.
-
Oct 2016
Under construction revision to app#200106131442 s3/r5. addition of exterior wall and roof at penthouses to provide protection from weather at elevator and stair doors. addition of approx 18"-24" to existing parapet wall to provide code compliant min 44" at occupied roof.
-
Apr 2019
Per sq ft planning 3.11.19 notice of enforcement-applt is submit new permit to complete mission st fcade &est a health fitness facility. shell wk: exterior weather proofing, complete facades, shell building, electrical&mechanical.interior tenant wk: interior partitions, lockerrooms, bathrooms exercise rms&assoc electrical/mechanical.
-
Oct 2022
Required deferred spray on fireproofing permit submittal. ref pa 2001-0613-1442 s4.
-
Dec 2022
Required "deferred elevator" permit submission. ref pa 2001-0613-1442-s4).
-
Jul 2023
T.i. on 2/f: empty floor to be divided into individual work spaces. work to include partition walls & common accessible bathroom facilities.g/f lobby to be reconstructed. all base building.accessibility works, mep, sprinklers, fire l/s under permit application 200106131442 s-4.
-
Jan 2026
New roll down security gate/doors front of building. 75% open to view, not a solid roll down door.
DBI holds 55 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 55. 24 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update