2790–2798 Mission Street
Mission · San Francisco, CA 94110
Permit history
-
Jun 1981
Additions alterations or repairs.
-
Jan 1990
Ewo-s.
-
Jan 1993
Seismic upgrade to 1st & 2nd fl/new roof over back of building.
-
Mar 1993
Exploratory work under permit application 9300462 for seismic upgrade.
-
Apr 1993
Replace exist hood with same size one using same exhaust blower.
-
Nov 1993
Plumb & electrical outlet for counter equipment.
-
Mar 1996
Construct 2 handicap bathrooms-see 9300462.
-
Feb 2000
Stucco fascia, emergency lighting, window retrofit.
-
Aug 2000
Fabricate & install one quarter awning.
-
Aug 2000
Sign.
-
Dec 2007
Add new bathroom & new flooring including toilet, sink, recessed light, floor tile.new enrty door with closer. remove portion of existing counter to provide 24" pull side clearance.
-
May 2008
Add new accessible bathroom, toilet, sink. close wall between stores, new flooring, upgrade main panel, remove existing interior stairs, new door, mew lighting, infill ceiling, change of use from retail store to electronic money transer (finanacial institution).
-
Oct 2008
Installatioon of split heat pump system, ducting and t-bar registers. ref. application 200805212557.
-
Oct 2009
Reroofing.
-
Jan 2010
Install an automatic door opener on existing door. 2-radio control push button on existing 3-0" door. no other work, install height 39" @ exteriior & interior.
-
Oct 2011
Replace sash b glass in large center window same opening.
-
Sep 2017
Barrier removal only - upgrade existing rsstroom in seating area of (e0 cafe including: new plumbing fixtures, hardware & finishes. electrical under separate. n ochange in use, occupancy, egress, construction type or sq ft, no fire sprinkler or alarm work required.
-
Nov 2021
Install new 2-step article 15 elevator at stairwell, renovate restrooms to be accessible, renovate adjacent offices, circulation spaces and upgrade storage room.
-
Jan 2022
Revision to pa 2021-1101-1541 non structural revisions to include restroom partitions reconfiguration due to existing structural conditions and raised floor to accommodate existing plumbing. revised door location 2 reception due to existing structural condition. no changes to fixture count.
-
Feb 2022
New led lighting and lighting control. altered power off existing panel. ref permit application 202201186099 and ref ew202202011132.
-
May 2022
Install new mechanical air cooled heat pumps, ductless fan coil units with refrigerant and condensate drain piping, and a rooftop exhaust fan.
-
Jul 2022
Revision to 202111011541. non structural revision to gr fl elevator control room and add hoistway vent.
-
Dec 2023
Revision to permit application 202212289285 & 202111011541 non-structural revisions, revise elevator from sec.5.2 to article 15 elevator per oshsb variance. provide hoistway platform for state elevator d.o.s.h approval of dec, 15, 2023.
-
Nov 2024
Patch and tape walls with drywall where missing patch tile floor with matching tile where missing re-install sink paint where needed walls only (ceiling in office only) add insulation in walls where needed.
DBI holds 43 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 43. 15 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and the early tenants. Submit an update