2843–2849 Mission Street
Mission · San Francisco, CA 94110
Permit history
-
Nov 2023
Install new shutter security door to the sotrefront of 2845 mission st. storefront will have shutter door installed to front of building covering entire window and door.ea shutter will be housed in a box at top of window frame behind and underneath awning with clear anodized curtain rolling down.
-
Nov 2023
Install new shutter security door to the sotrefront of 2847 mission st. storefront will have shutter door installed to front of building covering entire window and door.ea shutter will be housed in a box at top of window frame behind and underneath awning with clear anodized curtain rolling down.
-
Apr 2013
Move existing both front entrance doors to upstairs apt. approx 6" to front.
-
Jan 2012
Convert a existing coffee shop to a full service restaurant by adding 2 table and a toaster and 2 soup warmers. please ref to approved + completed permit application 2010/10/07/2485. mechanical, puc, building already approved.
-
Mar 2011
Dry rot repair and rebuild existing four studio units on 2nd floor. rebuild existing rear 2nd exit stairs, replace all windows, 6 at front. add insulation, dry rot repair existing flooring. stair repair and window replacement in kind. windows @ front to be wood casement and double casement.
-
Oct 2010
To comply with n.o.v.#201052709 to convert vacant beauty salon to a coffee shop with smoothie, milshake. upgrade existing toilet and ada entrance. prep sink and hand sink, add heating and ventilation system.
-
Aug 2010
Store layout plan. installation of new counters and electrical switches.
1 nominal $1 street-space permit is omitted.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.