1082 Potrero Avenue
Mission · San Francisco, CA 94110
Permit history
-
Oct 2019
Reroofing - front facade and main roofs. remove old roof. install new shingle roof. install in-kind shingle. in-kind light brown. underlayment #30.
-
Feb 2008
Dry rot repair around crasw space of building (front) repair 5/8 drywall and install metal connnector around wall. sill to joist of the existing floor in crawl space sub area. remove and clean up depris in crawl space and water heater room.
-
Nov 2001
As built revision to 200110261864-change to cpv, relocate the check valve.
-
Nov 2001
Revise 2001/10/01/9700. relocate stair to roof & proposed property line configuration.
-
Oct 2001
Sprinkler system (13d).
-
Oct 2001
Ladders to roof.
-
Sep 2001
Apply 5/8" type 'x' typ to north wall construct 1-hr parapet to north wall 1-hr property line wall t.
-
Nov 1986
To bring into code.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.