479 Potrero Avenue
Mission · San Francisco, CA 94110
Permit history
-
May 2024
Unit a: to legalize as built 3-fixture full bathroom on the ground level dwelling unit. the as built bathroom is converted and partitioned from the original 15-7x5' bathroom. each renovated bathroom size is 7-6x 5-0'. the bathroom legalixation shall include new lighting, electrical outlets, switches.
-
Jul 2022
Repair garage deck and parapet railing to match existing. replace beams over garage door, structural posts, studs/joist. street visible.
-
May 2022
Siding tear off existing vinyl and install 16 sq ft. (30) linear fl, new fiber cement (front of house).
-
Dec 2021
Unit a: window replacement: 10 windows in front of house existing vinyl new fiberglass: like for like- retrofit u-factor not to exceed 0.30.
-
May 2017
Replace a double and a single garage door. no window on the garage doors. provide 200 sq in vent in existing openings.
-
Sep 2010
To obtain final inspection for work approved under 2003-08-15-2268. all work is complete.
-
Mar 2010
Change rear wall left side corner dry rotted. replace in kind max 2 studs only. no windows & doors. replacement.
-
Mar 2010
Change rear wall left side corner dry rotted. replace in kind max 2 studs only. no windows & doors. replacement.
-
Aug 2003
Replace (3 each) 3 incorrectly installed pendent sprinklers with new vertical sidewall and.
-
Oct 2000
Install 10 replacement windows, in bedrooms, living rooms, &dining front.
-
Jul 1985
Incendental to permit #8505170 & #8406386.
-
May 1985
Shoring for new construction.
-
Sep 1984
New construction wood frame.
-
Jun 1984
New construction wood frame.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.