160–162 San Carlos Street

Mission · San Francisco, CA 94110

  • Built 1910
  • 6-unit apartment building
  • 3 stories
  • Zoned RH-3
  • District 9
  • Historic status: historic resource
37.7608, −122.4202 Street View appears here once a Google Maps embed key is configured.
4,284 sq ftBuilding area
2,000 sq ftLot area
18Rooms · 6 baths

Permit history

  1. Jan 2023

    Remodeling kitchen.

    Complete Permit 202301099848 $$$ $12,000
  2. Aug 2020

    Install low frequency in all sleeping area for sffc section 1103.7.6.1, total of 12 sounder from existing f/a system.

    Complete Permit 202008182046 $$$ $5,000
  3. Apr 2019

    Install new fire alarm for fire sprinkler monitoring system.

    Complete Permit 201904309345 $$$ $5,000
  4. Apr 2019

    Install n ew fire sprinkler system per nfpa 13 for the gr fl only. included 2" fire service total 26 heads.

    Complete Permit 201904127904 $$$ $16,000
  5. Oct 2018

    Reinforce existing foundation along north and south property line and foundation at main entrance. soft story revision to 2016/06/02/9004. replace foundation due to field conditions. all costs shall be part of soft story work.

    Complete Permit 201810021977 $$$ $20,000
  6. Jan 2018

    Revision to 201606029004, install 2 moment frames at front of building.

    Issued Permit 201801309962 $$$ $1
  7. Jul 2017

    Recommencement & completion of work approved under permit application 201606029004.

    Issued Permit 201707101418 $$$ $16,000
  8. Jul 2016

    (unit legalize ord 43-14.) legalize existing unit on grd floor at rear of building (one unit) per plan. living room, kitche, two bedrooms, & one bath.add one new unit on grd fl at front of building (one unit) per ord#30-15. one storage, living room, kitchen, bedroom, full bath. (soft story permit application 201606029004.

    Complete Permit 201607213023 $$$ $60,000
  9. Jun 2016

    Soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4.

    Complete Permit 201606029004 $$$ $20,000
  10. Nov 2012

    Remodel 1 kitchen. size 10x11. lighting must comply with cec 150(k).between 9/12.

    Complete Permit 201211093908 $$$ $8,000
  11. May 2012

    #b- remodel kitchen & convert laundry at the unit from electric dryer to gas dryer, kitchen permanently installed lighting shall have a min. of 50% wattage be high efficacy, dryer is lcoated at closet open to kitchens.

    Complete Permit 201205210913 $$$ $8,000
  12. Sep 2011

    Unit b: (1) kitchen remodel, renew the bathroom toilet and sink. replace the bathroom tiles. no window work, lighting to comply with cec 150(k). no door work on this permit.

    Complete Permit 201109295785 $$$ $8,000
  13. Apr 2011

    Repair dry rot deck, less than 50% repair in kind.

    Complete Permit 201104214578 $$$ $3,000
  14. Oct 2005

    Renew for final inspection no 200504129861- 200406035449-9720622.

    Complete Permit 200510276723 $$$ $1
  15. Apr 2005

    Renewal permit application 200406035449 for final.

    Expired Permit 200504129861 $$$ $3,500
  16. Jun 2004

    Stair repair (less than 50% being replace without drawings).

    Expired Permit 200406035449 $$$ $3,500
  17. Oct 1997

    Reroofing.

    Expired Permit 9720622 $$$ $3,500

5 nominal $1 street-space permits are omitted.

Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.