1055 Shotwell Street
Mission · San Francisco, CA 94110
Permit history
-
Jun 2022
Reroofing: remove and replace roofing material / existing roofing material (in-kind).
-
Jul 2012
Add master bath & expand closet - relocate existing wall (non load-bearing) 24" from exisitng location, extend wall dividing bathroom from closet, add plumbing, replace electrical.
-
Apr 2011
Kitchen remodel, range and fridge in new location, replace cabinets & countertop.
-
Aug 2010
Optional anchor bolt retrofit, install 5/8x12" threaded rod epoxy set with 3" square wasers at 4' spacing in existing perimeter foundation, install plywood stiffening panels on all 4 basement walls, 1/2" cdx plywood with 10d edge nailing at 3" & 12" field nailing, 6" sds screws at 8" to joists above.
-
Dec 1990
Reroofing.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.