Mar 2025
Fire alarm system upgrade to comply with sffc section 1103.7.6.1.
-
Sep 2020
Adding six (6) units on first level per ordinance 162-16. convert existing garage into new dwelling units within existing envelope. fourteen new bedrooms, ten new bathrooms, six new dishwasers, ten new washer/dryers. new windows facing the street.
-
Feb 2020
Remodel kitchen & bathroom at one unit on 3/f. new counters, cabinets and plumbing fixtures in kind. new tile, vanity & fixtures in kind. no change to mechanical, no exterior work, fire alarm & sprinkler. no structural.
-
Jan 2020
Remove and reconnect sprinkler pipe in five units <as-built>.
-
Dec 2019
Renovation of 2 apartments, one unit on 2nd level and one unit on 3rd lvl. new bedrooms. new kitchen cabinets and plumb fixt. new washer dryers. new lightihng e jbox locations. no chante to mechanical. no exterior work. no fire alarm or sprinkler. no structural two bathroom remodels in two units.
-
Sep 2019
Remodel kitchen & bathroom @ 1 one unit on 4th fl. kitchen 70 sq ft. new counter, cabinets and plumbing fixture in kind. bathroom 40 sq ft. new tile, vanity & fixture in kind. no change to mechanical, no exterior work, no fire alarm/sprinker work no structural.
-
Aug 2019
Reno of one unit on 4th floor. conversion from 1bd/1ba to 2bd in one unit new: kitchen cabinets, plm fixtures, with d, d/w, lighting at existing j-boxes. no change to mechanical/ext/fire alarm or sprinklers. no strucutral work.
-
Apr 2019
Renovation of unit in second third and fourth floors.
-
Mar 2019
Exploratory demolition in 7 units for cost evaluation. demolition not more than 50 sq ft in each unit: #102, 103, 108, 202, 208, 301, 302. replace all demolition in kind.
-
Aug 2017
To obtain final inspection for work approved under permit application 2016-05-20-8019. all work is complete.
-
Jul 2017
Exploratory demolition in garage (for soft story retrofit design) not to exceed 300 sq ft of drywall demolition on walls, 150 sq ft ceiling. maintain all fire rated assemblies.
-
Jun 2017
One unit revision to 201605208019 revise heat from gas to electric add t-24 report.
-
Jan 2017
Repair exterior dry rot on either side of 2 windows, including the rim joists above and below, work includes 2 bays on either side of window and patch back stucco.
-
Oct 2016
Renovation of one unit, including new bedroom, remodel to kitchen and bath new partitions, new laundry, new lights, revisions to heating. no exterior work. new laundry.
-
Sep 2016
Mandatory soft story seismic upgrades per sfebc chapter 4d, 2016 cebc appendix a-4.
-
Jun 2016
Renovation of four units including renovation of kitchen, bath, bedroom, revised lighting and heating.
-
May 2016
Renovation of one unit, 2nd level - renovation of kitchen, bath, relocation of partitions, lighting and electrical revisions and replacement of existing heating. adding 1 new bedroom, addition of new laundry.
-
Apr 2015
#206- kitchen and bath remodel, no walls, no windows, no change to egress, no life safety.
-
Jan 2015
Work in two units: replace sheetrock in bathrooms and paint, approx. total 30 sq ft in area at each bathroom, no wall relocation. no lighting work.
-
Oct 2006
One unit. kitchen / bath remodel in kind. no structural changes, sinks, faucets, shower valve, cabinet, counter top, electrical code upgrades. no window or door work.
-
Aug 2003
Reroofing.
-
Mar 1986
To bring building into full compliance wth the provisions.
1 nominal $1 street-space permit is omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.