510–524 South Van Ness Avenue
Mission · San Francisco, CA 94110
Permit history
-
May 1985
Install domestic solar hot wateer to existing.
-
Sep 1988
Reroofing.
-
May 1989
Reroofing.
-
Feb 1991
Revise existing light & vent for 2 units.
-
Oct 2001
Site permit-proposed 2 additional floors over exist three floors.
-
Sep 2003
Oti-1, 1st floor: el, me, l/s, sp.
-
Sep 2003
Reroofing.
-
Apr 2005
Accessible units (6 units) for door to 32" opening. remove existing door on existing closet.install.
-
Apr 2005
Accessibility improvements at entry: renovation work for new men's & women's restrms @ ground fl.
-
Apr 2005
Renovation/repair of second floor men's & women's restrooms.
-
Aug 2006
Comply nov 199706519, 200225880, 200228532, 200453419, 200455469. accessible units (10 units) fix doors to 32" opening install ada sink, lower mirror to max 40".
-
Dec 2009
Increase estimated job cost by $10, 000 as per correction notice.
-
Dec 2009
Increase estimated job cost by 10, 000 as per correction notice.
-
Jul 2011
Install new aluminum window system at reception desk, move security gate closer to front entrance door, replace existing hall door with new, reframe 4' of hall wall to create better view of entrance.
-
Nov 2016
Relocate plumbing, electrical and vent ducts for dryers, build soffit to enclose duct work. patch and refinish concrete walk way inside building. reinstall 4 washer/dryer units and 1 dryer. no sink. dryers shall comply with cmc 905.0.
-
Aug 2017
1/f - 1 bathroom - remove & replace tiles in bathroom & shower floor; installl new wax ring on toilet. install new waterproofing on floor.
-
Mar 2018
Remodel bathroom replace toilet, shower stall & vanity sink in one unit. n/a for maher.
-
Jul 2018
Rehabilitation of existing restaurant with new accessible restrooms.
-
Dec 2018
Interior new alteration to e 2nd fl mens bath to comply with nov 201802994.
-
Dec 2021
Ground fl lateral upgrade to comply with sq ft ab-094 ordinance (based on asce 7-16 standards). 3 steel special moment frames and concrete foundation in lobby. 1 smf in front storage unit.
-
Dec 2022
Voluntary system replacement per csfm code interpretation 12-001 and new lf horns to comply with sffc 2019 sec 1103.7.6.1.
-
Oct 2023
New alteration; remodel to existing 2/f women's bathroom-replace partition walls; stalls; new finishes and waterproofing, new fixtures; restroom accessories, new lighting; electrical fixtures, new soffit.
-
Feb 2025
3/fl-new alteration and remodel to existing 3rd floor mens and womens bathroom.
-
Jan 2026
Install 239 lf sounders in sleeping areas of every unit in levels 1, 2, 3. install new telguard comm., 2 power supply, new mini module with telguard. replace existing annunciator, existing facu with ifp-75, existing dual monitor. install new slc expander with 6850. replace strobe in all ada rooms, existing idp smoke.
DBI holds 59 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 59. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update