1338–1342 Stevenson Street
Mission · San Francisco, CA 94103
Permit history
-
Apr 2026
One unit-b: remodel existing kitchen and bath. no change to layout. all work in kind. install new electrical panel, new lights.
-
Jul 2025
Reroofing. hot. remove existing membrane, drainage corrections, mechanically fasten (28) fiber glass base sheet with 1 1/4" sq head nails. all standard size roofing flashings penetration will be required with new. install new scuppers, torch apply (1) layer of flintlastic gta class b fire rated clean up.
-
Nov 2022
Work @ one unit-b only: kitchen remodel. no change to walls.
-
Nov 2018
One unit; renovation of appartment on 3rd fl. add dishwasher & washier/dryer, addition of (1) bedroom & (1) bathroom, new plumbing fixtures, new lighting, relocate of hot water heater, no change to mechanical. no exterior work, no fire alarm or sprinkler work, no structural work n/a maher.
-
Oct 2018
Adding (2) units (e&f) on ground fl per ordinance #162-16. convert existing storage space into new dwelling units within existing envelope. (3)new bathrooms, (2)new dishwashers, (2)new washer/dryers. sprinkler & fire alarm under separate application per sffd ab-2.01.
-
Dec 2017
Interior renovation of units #c & d. adding 1 new bathroom, 1 new bedroom. new washer & dryer, new appliances, new dishwasher, new plumbing fixtures, new fixtures, new finishes & new lighting. no change to mechanical. no ext work. fire alarm & sprinkler work under sep permit. maher na.
-
Dec 2014
Soft story retrofit by upgrading ground floor walls to shear walls. add plywood sheething, anchor bolts and hd anchors. comply with sfbc 2012 iebc appendizx a-4.
-
Mar 2008
Replace bay porch wood delay wood posts & sills less than 50% of structures. repair over 50 % will require plans. not visible from street.
-
Sep 2006
Reroofing.
-
Jan 1995
Shoring and underpinnng.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.