350 Treat Avenue
Mission · San Francisco, CA 94110
-
1944
Built as an industrial building, recorded as occupied by Stair factory. Designed by Alfred P. Fisher. The survey credits Alfred P. Fisher in 1944 and J. Lloyd Cornish in 1947.
-
Dec 1994
Reroofing.
-
Sep 2011
Separation of welding operation from automotive repair by 2 hour wall/ceiling. modify entrance to building by installing at framp at entry and lower slab at interior. install automatic push botton at entry. change doors, hardware in path of travel. modify sprinkler system as necessary. sep permit.
-
Jan 2014
Demolition existing partition wall, plumbing fixtures and a portion of the slab for future plumbing. work also includes minor electrical demolition. no exterior work included in this permit. per ab-017.
-
Feb 2014
Voluntary access upgrades to the main entrance restrooms and main stair. work also includes demolition to small portion of roof and kitchenette and breakroom. 2nd exit added. mep and fire under separate permit. maher ordinance not required.
-
Nov 2015
Reroofing.
-
Mar 2016
New roof mounted boiler and hvac units and assoc. equip. with associated structural, ducting plumbing and electrical; new wall insulation and interior cladding; new electrical service pg&e transformer room, new electrical room, and associate changes. n/a for maher.
-
May 2016
Grd. floor. relocate two fire sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref permit application 201603031142. n/a maher ordinance.
-
Nov 2017
Interior tenant improvement of existing space to accomodate light manufacturing of laser sensors. scope includes structural alteration to mezzanine and mep. build out of clean room under sep permit maher not req. sprinklers deferred.
-
Dec 2017
Demolition of mezzanines and reinforcement of existing columns at roof structure. n/a for maher.
-
Jan 2018
Install 11 pendants & 11 new uprights of 13 new mechanical tees for new configurations. ref pa 2017-1121-4631.
-
Jan 2018
Revision to permit application 201711214631, install new exhaust for existing pantry room and electric cooktop. maher na.
-
Feb 2018
New fire alarm system includes 1 fire alarm control unit; 1 icgm-4 communicator, 1 annunciator; 2 photoelectric smoke detectors; 3 dual monitor modules, 1 manual pull stattion; 10 wall mounted horn/strobes, 7 ceiling mounted horn/strobes; 6 wall mounted strobes; 2 ceiling mounted weather proof.
-
Apr 2018
Administrative permit to document that work performed under permit application 201109084137 was superceded by work under permit application 201711214631. maher na.
-
Apr 2018
Revision to permit application 201711214631. exterior door replacement.
-
May 2018
As-builts: ref permit application 201804055583 - added two relays for roll-up door close, access control shunt. eol changes. new door ref #201804126153.
-
Sep 2018
Demolition of existing non-load bearing demising wall. patch& repair any damaged wall. new non-load bearing partition walls and doors. new t-bar ceiling and lighting fin fab clean room. new wall mounted lights in exist corridor.
-
Sep 2018
Install 6 evac signs.
-
Oct 2018
Ref 201809049004 provide and install heating, ventialation, air conditioning and ductwork for fabrication clean room space.
-
Oct 2018
Install 45 new pendants off of 29 new mechanical tees for new room configuration ref 201809049004-ordianary hazard spacing and new siesmic bracing calcs.
-
Nov 2018
Fire alarm ti: add 5 horn strobes 3 strobes, 1 duct detector with smoke and relay module. ref permit application 201809049004.
-
Jan 2019
New lighting, new electrical outlets, new electrical panels, new 112.5kva transformer. ref ti #201809049004.
-
Jan 2020
Furnish and install fluid cooler and circulating pumps to serve 5 environmental test chambers / condenser water system at exterior.
-
Jul 2024
This project is the construction of an accessory structure housing shaking test equipment.
-
May 2026
Alteration to existing interior non load bearing wall. relocation of existing door and creation of new convenience door connecting areas fo the facility.
DBI holds 26 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 26.
The survey dates this building to 1944 in one place and 1945 in another. The survey dates this building to 1944 in one place and 1947 in another. Not yet documented: the developer and the early tenants. Submit an update