1300–1314 Utah Street
Mission · San Francisco, CA 94110
-
March 21, 1951
The Office of the Assessor-Recorder photographed the property for tax assessment. Rivers' Pharmacy and T & O Lunch Annex were at the address.
-
Oct 1982
Additions alterations or repairs.
-
May 1987
Install new front window panel, install new front doors.
-
Jun 1987
Replae all dry rot mud sills & studs.
-
Mar 1988
Legalize occupancy from deli-store to church assembly.
-
Oct 1999
Comply with complaint #9901389.
-
Sep 2002
Remove all illegal plumbing fixtures, water heater, partition wall @2nd floor & comply n.o.v#200231227.
-
May 2003
Seismic retrofitting for hazzard reduction of umb & ada compliance work.
-
Feb 2004
Reroofing.
-
Mar 2004
Compliance to complaint 200447303 and remove all violations as stated in complaint 200447340. all.
-
Aug 2004
Restore water closet area in 2nd floor area to garbage rm as required by item 8 in nov issued 2/10/04.
-
Dec 2005
Umb ada compliance revision 200305134406. provide accessible features 20%.
-
Sep 2014
Install 8 windows in front to comply with #3 on complaint 201491891 with double-hung custom wood sash windows.
-
Sep 2015
Compy with nov. #201540291. change use from 16 guest room and one dwellingunit over commercial to 16 guest rooms and one dwelling unit over one dwelling unit. commercial space at ground floor to be converted to one dwelling unit.
-
Oct 2016
To comply with complaint #201636081 dated 09 sept. 2016. n/a maher ord. 155-13.
-
Aug 2017
Abate nov#201540291 by removing partition walls installed without permit and reverting to last approved floor layout ref. permit application 200305134406, under ab-017, disabled access upgrade deferred. n/a ordinance #155-13.
-
Jan 2018
To comply with notice of violation #s: 201724511, 201643772(7, 8, 9, 14), 2017018312(2). repair wall and ceiling. installing grab bars, replacing bathroom plumbing, electrical, tile.
-
Mar 2018
Permit to comply with nov# 201724511 (1) bathroom remodel on 2nd fr, common use ada bathroom 350 sq ft no alteration of any walls.
-
Mar 2018
Permit to comply with nov# 201701831, provide grab bars at all common use (2) bathing & lavatory faciliites for grab bars.
-
Oct 2018
Replaced old electrical wire~kf21& with new electrical wiring. plumbing to be replaced. bathroom to be added in each room and add 2nd layer drywall(sheetrock) to address the complaint #201898943, 201863771.
-
Jul 2019
Repair roof leakage, about 2 feet long and ceiling below damaged by leakage. to comply nov#201919171 #3 patch repair existing flat roof not visible from the street.
-
Oct 2019
To comply with nov 20191917, #7. repair damaged walls in rooms 10 & 13. relace ceilings in rooms 10 & 13. damaged repair of walls is limited to patching wall finishes only. no structural work. repair in kind.
-
Oct 2019
Repair done to comply with nov 201921663, adding heating system to comply with nov 201921581, adding 16 bathrooms to existing guestrooms on 2nd fl. replace old electrical wire with new electrical wire. add second layer of sheetrock to address nov 201898943/201863771.
-
Dec 2019
Comply with novs: 201953351; 201919171; 201921663; 201898943. repair drywall. inspect & repair sub-flooring & flooring in #10 & 13. repair doors & door jambs. repair windows as needed, nov #201919171 item #2, 9, 10. nov # 201953351 item # 5, 6, 7, 8, 9.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update