225 Valencia Street
Mission · San Francisco, CA 94103
Permit history
-
Jan 1985
Install new stairways, elevator, mechanical, plumbing system.
-
Jan 1985
Non-structural demolition preparatory to remodeling project.
-
Mar 1985
To install fire sprinklers in the basement level.
-
Feb 1987
Repair of fire damage.
-
Jul 1997
Seismic upgrade.
-
Nov 1998
Revision to #9712467, access to handicap restrm, enlarge corri.
-
Jul 1999
New partition walls, doors, drinking fountains, water closet.
-
Nov 2013
Correct entry in permit application 9914724. box (7a) should read "retail sales" and box (7) should read "office" change of use from a occ to b occ.
-
Feb 2014
Demolition of interior non structural partitions and non-fire rated. compliance with ordinance no. 15-133 nor required. excavation < 50 cu yd. or no excavation.
-
Jun 2014
Relocate reestroom for 1st and 2nd floor; add kitchen at 1st and 2nd floor; compliance with ord 155-13 not required.
-
Oct 2014
Revise 201406047451, remove 2 small offices and one conference room at 2nd floor, make one opening at existing wall at 1st floor. maher n/a.
-
Feb 2015
New sprinkler system to replace the old existing fire sprinkler system using exiting 4-inch fire service. system has existing water meter. total 127 new heads.; maher n/a.
-
Mar 2015
Installation of a sprinkler montoring system including: fire alarm control unit, smoke detector, manual pull station, & monitoring modules to monitor waterflow & tamper. sprinkler t.i. #201502138356 & t.i. #201406047451. n/a maher ordinance.
-
Apr 2015
T.i. subdivide 1st floor into 3 spaces. new private offices on 1st and 2nd floor. n/a for the maher.
-
May 2015
New ada shower in existing ada bathrooms on 1st and 2nd floor. n/a for the maher.
-
Jun 2015
Exterior patch & repair of facade; replacement of tile in-kind; maher n/a.
-
Jul 2015
Comply with planning violation 2015008952enf. replacement of existing storefront and transom windows. paint existing tiles and doors. replace exterior lights. maher not req.
-
Aug 2023
Convert existing two tenant retail sales uses of ground floor to health services. no further proposed changes.
-
Aug 2024
Change of use and occupancy to outpatiet clinic. includes: 1st & 2nd floor interior tenant improvements and elevator replacement. exterior work includes: rooftop mechanical equipment replacement and restoration of existing valencia street and clinton park historical facades.
8 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update