884–896 Valencia Street
Mission · San Francisco, CA 94110
Permit history
-
Mar 2026
To obtain a final inspection for work approved under permit application 202102044024. all work is complete.
-
Sep 2025
Tenant improvement to existing retail space. electrical work deferred from permit permit application 202505166685. replace track lighting, change outlet locations.
-
Aug 2025
Demolishing a shower stall & shower pan, replacing floor & sheetrock to comply with complaint 202541009.
-
Jul 2025
Install scissor gate to front of storefront.
-
May 2025
T.i. to existing retail space consisting of new lighting and partition wall for storage wall for storage room. replace existing sink in kind. existing storefront entrance to remain. no change in occupancy. existing common restrooms in use to remain.
-
Aug 2023
System replacement & lf horns upgrade to meet sffc 2022 sec 1103.7.6.1.
-
Feb 2021
Addition of common laundry room at basement level.
-
Dec 2017
Title-24 lighting. ref app#201710121096. n/a for maher.
-
Nov 2017
Upgrade to existing fire alarm system to meet new sffc. install new power supply panel near existing control panel on 1st floor. install sunders inside every unit. new devices will be tie-in to existing panel. ref #2014-0219-8830. maher na.
-
Oct 2017
Revision to permit application 201704053247 & 201708114616, new stackable washer/dryer & new hot water heater. n/a ordinance #155-13, maher n/a.
-
Oct 2017
Non structural tenant improvement, freestanding display fixtures, wall mounted shelves and mirrors, no electrical, no mechanical. ref landlord core/shell permit 201703091033; maher ord 155-13 na.
-
Aug 2017
New hvac system only, electrical under separate permit. ref core & shell permit application 201703091033.
-
Jun 2017
Add 886 valencia st to 3597/012 for commercial space, split from 888 valencia st. ref appl #2017-03-09-1033.
-
Apr 2017
T.i new plumbing, 2 shampoo bowls and 1 sink at work room. t.i. nw hrv unit & distribution. t.i. add outlets at hairstations(seperate permit by sub). all existing lighting to remain 1 nw pendant by sub. n/a for maher.
-
Mar 2017
G/f -non structural core & shell by landlord. new partitions, new storefront, new restrooms & fixtures, new electrical panel, no new electrical distribution or lighting in tenant spaces until future ti plans are submitted. no existing mechanical system maher na.
-
Mar 2017
(1) change retail use from 790.102 sales and service to 790.108 personal service.occupancy from "m" to "b" (2) add new metal folding scissor gate to exterior. n/a maher ordinance.
-
Feb 2014
Like for like voluntary fire system replacement with elevator modernization. n/a for the maher ordinance #155-13.
-
Dec 2013
One unit: replace kitchen cabinets & counters. add new circuits & plug receptacles. replace floor covering (tile), existing walls to remain. layout of kitchen to remain unchanged.
-
Aug 2013
Comply with dbi complaint #201157827 & dcp complaint 11426 - remove two silid roll down door at valencia (grocery store), one at valencia frontage & one at 20th st frontage. replace with two metal sissor gates.
-
Mar 2012
Repair structural slab at sidewalk.
-
Dec 2011
Revision to 201110146864. change of approved plans back to original build. see cloud area.
-
Oct 2011
Upgrade to ada bathroom, add 1 1-hour fire rated wall, add 1 20- minute fire rated door and frame and relocated 1 existing 20-minute fire rated door and frame. add one wall.
-
Oct 2011
Addition of automatic door opener- int. mount. entry doors (pedestrian) at side walk, upgrade existing electrical. subpanel to new 200 amp, 3 phase subpanel in existing loc. no fire inspection required.
-
Jul 2011
Remodel storefront.
-
Jul 2011
Add 2 ada compliant restrooms.
-
May 2011
Eliminate 8 sidewalk skylights & replace with concrete sidewalk. eliminate 1 coal loading shaft opening & replace with concrete sidewalk, elimnate 1 elevator shaft opening & replace with concrete sidewalk.
-
Feb 2011
Construction of new concrete shearwalls in basemnt for voluntary structural strengthening. new steel frames behind windows, no change to existing facade/storefront. add ada bath to 1st level.
-
Sep 2002
Reroofing.
-
May 1995
Parapet reinforcement.
-
Jan 1992
Commercial renovation.
-
Nov 1991
Repair fire damage.
-
Nov 1988
Remove & replace hallway doors, windows & replaster halls.
3 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.