58–60 Woodward Street
Mission · San Francisco, CA 94103
Permit history
-
May 2017
Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.
-
Jan 2016
#a-interior remodel 60a woodward apt unit at 2nd fl. remodel existing kitchen and bath. new bedroom to replace existing living room. no structural work.
-
Jul 2014
Remodel 58 woodward apt unit at 4th floor; remodel existing kitchen & existing bathroom; new bedroom to replace existing living room. replace windows in kind at lightwell.
-
Dec 2013
Remodel 58 woodward unit. new plmg, electrical. all new 5/8" type "x" gypsum sheetrock. replace 3 existing kitchen window sashes with aluminum inserts. all windows not visible from street.
-
Apr 2013
Replace 900 sq ft. of siding at rear.
-
Mar 2013
Reroofing.
-
Mar 2013
Kitchen & bathroom remodel - replace cabinets fixtures, appliances, laundry in kind, add sub panel, upgrade electrical to code.
-
Jan 2013
Replace kitchen cabinet & counter tops, 1 kitchen & 1 bathrm remodeling; replace bath tub toilet & vanity, tub surround & floor, ele & plumbing fixtures, no change in wall layout & openings, a min of 50% of total rated wattage of permanent kitchen lighting shall be high efficacy, permanent bathrm lighting shall.
-
Feb 2012
Comply with his nov 201114381: install a code compliant dryer vent connector and remove illegal service unit in garage with plans.
-
Nov 2001
Extend cleanout & replace damaged siding.
-
Aug 2000
Paint front of the building. to comply with n.o.v.
-
Jan 1999
Bolting foundation in bed concrete roll wedge anchor with epoxy.
-
Jul 1990
Reroofing.
1 nominal $1 street-space permit is omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.