65–69 Woodward Street
Mission · San Francisco, CA 94103
Permit history
-
Jan 2022
Reroofing.
-
Jan 2019
Rev. to permit application 201809130106 to replace 5 footing and post in kind.
-
Nov 2018
New cabinets new flooring repairs as needed eletric up grade plumbing fixtures changes. kitchen and bath remodel. no change on floor plan for all six (6) units in the existing building.
-
Sep 2018
Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. and additional voluntary structural improvements.
-
Feb 2017
Comply with nov#201654911 item #4 & 5.
-
Nov 2016
Comply with nov # 201600602. repair bathroom floor.
-
Jun 2012
Comply with following complaints: (201216501) & (201216521), replace wall heater (#201216541) 65a woodward: provide weather stripe ext. doors & dead locks, repair tile @ bath tub and any dry rot damage, provide new flooring @ kitchen & repair cabinets as best as possible, repair sheetrock @ several.
-
Mar 2005
Wood stairway at front of the building to be repaired-less than 50 percent of structure nov 20045450.
-
Apr 2001
Complete domo existing wood stair & replace new stairs @ rear, same location footprint.
-
Jun 1989
Reroofing.
-
Apr 1989
To correct code violation per dahi report.
-
Apr 1989
Repair the exhibit b under appln. #8814989.
-
Oct 1988
Replacing back stairs.
-
Feb 1985
To make repair to bring building. int compliance with s.f.
5 nominal $1 street-space permits are omitted.