883–895 Bush Street
Nob Hill · San Francisco, CA 94108
-
1920s
The Royal Court grocery traded here in the 1920s.
-
1960
The Have One; two officers were suspended in 1960 for taking payoffs from this bar and the 585 Club.
-
Jul 1995
2 conc platforms for 2 hot water heaters. replace existing heaters.
-
Jul 2000
Reroofing.
-
Oct 2004
Remodel existing tenant space retail use to deli cafe new cafe use and deli tenant improvement and.
-
Sep 2007
Change of use to convert grocery store to grocery and restaurant.
-
Sep 2011
Kitchen: remove and replace all cabinets, countertop, sink and fixtures. no change to exterior window, walls, & doors. bathroom: remove and replace vanety sink tub-toilet fixture lighting, replace light fixture by high effecency, electrical. and plmg as needed lighting to comply with cel 150 k.
-
Jun 2012
Remodel one unit: remove non-load bearing walls, appliances, and fixtures to remodel kitchen, bath and bedrooms. replace window in bath. replace lighting with high efficacy lighting and electrical work as necessary.
-
Jul 2012
Remodel kitchen and bathroom. new kitchen cabinets, replace bathroom toilet, tub, vanity. all plumbing as needed. update electrical as needed.
-
Aug 2012
Remodel one unit: remove non-load bearing walls, appliances and fixtures to remodel kitchen, bath, and bedrooms. replace window in bath. replace lighting with high efficiency lighting. plumbing and electrical work as necessary.
-
Aug 2012
Remodel one unit: remove non-load bearing walls, appliances and fixtures to remodel kitchen, bath, and bedrooms. replace window in bath. replace lighting with high efficiency lighting. plumbing and electrical work as necessary. new fr walls, access to fire escape, smoke and co detectors.
-
Oct 2012
Interior remodel one unit. remove non load bearling alls to relocate kitchen and bedroom. remodel e bath. replace 2 e windows per plan. electrical and plumbing as necessary. replace lighting with high efficacy lighting.
-
Jan 2013
Interior remodel of one unit: remove non-load bearing walls to relocate kitchen, provide new bedroom. remodel existing ath. replace 1 existing window per plan. electrical and plumbing work as necessary. replace lighting with high efficency lighting.
-
Feb 2013
One unit inteiror remodel: remove non-load bearing walls to relocate kitchen. relocate one existing bath & remodel one existing bath. replace all existing windows facing lightwell. electrical & plumbing work as necessary, replace lighting with high efficacy lighting.
-
Mar 2013
One unit: interior remodel at one unit. remove non-load bearing walls to relocate kitchen. provide new bedroom. remodel existing bath. electrical & plumbing as necessary. replace lighting with high efficacy lighting.
-
May 2013
Interior remodel in one unit: remove non-load bearing walls to relocate kitchen. provide new bedroom. remodel existing bath. electerical and plumbing work as necessary. replace lighting with high efficacy lighting.
-
Jun 2013
Interior remodel one unit. relocate kitchen convert kitchen area into new living area. remodel e bath. electrical and plumbing work as necessary. replace lighting with high efficacy lighting.
-
Jan 2014
Interior remodel one unit: remove non-load bearing walls to relocate kitchen. provide new bedroom. remodel existing bath.
-
Oct 2014
Work in bar only- occupancy remains the same, no structural alteration, no exterior work. bar and ada restroom remain, interior cosmetic work: furring as needed for hard ceiling and wood moulding, repair limited areas sheetrock, new floor covering, new paint and redo electrical on seperate permit.
-
Dec 2014
One unit - renovate kitchen and bathroom; plumbing and electrical as needed; no structural workl; to comply with cec150.0(k)3&5.
-
Mar 2015
One unit interior remodel: non-structural alteration. remodel existing kitchen. relocate existing bathroom. provide new office.
-
Nov 2016
Non structural interior remodel one unit. relocarte e kitchen, e living and e bedroom. remodel e bath. egress window not req 6th fl above grade per cbc 1029.1.
-
Feb 2017
One unit: renovate kitchen and bathroom. replace in kind. kitchen cabinets and bathroom all plumbing and electrical needed.
-
May 2017
Add unit per ord #162-16. provide 2 new accessory dwelling units at existing covered parking garage at basement persuant to ord 162-16. provide 2 new class 1 bicycle parking spaces at basement. new units to be sprinklered under separate permits. no structural work.
-
Mar 2021
Voluntary upgrade of existing fire alarm system to comply with sffc section 1103.7.6.1.
-
Sep 2022
Expansion of existing bar into vacant next door space (891 bush), scope of work includes new bar, finishes, furnishings and ada bathroom. mep deferred.
DBI holds 61 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 61. 8 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update