1369 Hyde Street
Nob Hill · San Francisco, CA 94109
-
1910
The Keystone Apartments, designed by Oliver, Foulks & Kaiser — a $500,000 building advertised with a roof garden and children's play annex, a billiard room, a bowling alley, a library and a ballroom, and one of the earliest high-end large apartment buildings in the city. A metal and glass marquee marks its entrance.
-
Jul 1987
Renovate bath, kitchen @ two units.
-
Oct 1994
Seismic upgrade of umb per ordinance #225-92 73-93.
-
Apr 1996
Combination anchor at roof & floors diaphragms extend cross.
-
May 2017
One unit: upgrade plumbing and electrical. remodel 2 bathrooms and 1 kitchen. in kind.
-
Feb 2021
One unit: rev to pa202101223188: demolish existing non-load bearing wall and ktichen cabinets. install new wood stud wall and compact combo kitchentte unit as shown on plans betwen kitchentt & bathroom.
-
Jun 2021
One unit - 1st floor: renovate (1) existing dwelling unit within an existing building at first fl. renovation scope includes remodeling existing kitchen & bath, installing washer/dryer and converting existing living to bedroom. must comply with sffc 1103.7.6.1. fire alarm under sep permit.
-
Jun 2021
Renovate existing one unit; relocate kitchen and bath, install washer/dryer, and expand unit into corridor, relocate unit entrance.
-
Jun 2021
One unit: relocate existing kitchen, build new full bathroom.install washer/dryer and convert existing dining to bedroom. maher n/a.
-
Jun 2021
One unit: relocate existing kitchen, build new full bathroom.install washer/dryer and convert existing dining to bedroom. maher n/a.
-
Jul 2021
Add 16 adus per ordinance 162-16 at first and second floor levels and storage areas within the existing building envelope. existing building is (71) residential dwelling units (13) guest rooms and 5 unwarrented units. existing unit a legalization under separate permit.
-
Aug 2021
4th floor - one unit - rehabilitate existing kitchen & bathroom; install second bathroom; install washer & gas dryer; capture 118 sq ft gross corridor dead end space to enlarge bedroom/add closet.
-
Sep 2021
Construction new exit acess stairwell between levels 6: 7 remodel two units to accomodate new stair one unit to receive remodeled ktichen and new washer/dryer.
-
Oct 2021
#5: 1) rehabilitate existing kitchen.2) convert existing living room to study. 3)rehabilitate existing bathroom. 3)install washer and dryer.
-
Oct 2021
#4: 1) rehabilitate existing kitchen. 2)rehabilitate existing bathroom. 3)install washer and dryer.
-
Oct 2021
1st floor - one unit: convert existing kitchen to second bathroom. relocate kitchen, rehab existing bathroom. convert existing dining to office. install washer/gas dryer.
-
Nov 2021
One unit: install second bathroom. rehab kitchen, rehab existing bathroom. convert existing dining to bedroom. install washer/dryer.
-
Jun 2022
#44: rehabilitate existing kitchen. rehabilitate existing kitchen. install second bathroom. install washer & dryer.
-
Nov 2022
#33. convert existing living to bedroom. rehab existing kitchen, rehab existing bathroom, install washer/dryer.
-
Nov 2022
Replace system in kind to meet code 1103.7.6.1 to add low frequency sounders in all sleeping areas. additions of smokes & pulls in all common areas.
-
Jan 2023
One unit. convert existing dining to living. convert existing living to bedroom. rehabilitate existing kitchen. rehabilitate existing bathroom. install washer & dryer.
-
2024
Evaluated in the city's citywide survey of large apartment buildings as retaining excellent integrity and appearing eligible under both Criterion A/1 and Criterion C/3, for its architectural quality and for being one of the earliest large, high-end apartment buildings in San Francisco.
-
Jul 2024
One unit: rehabilitate existing kitchen. rehabilitate existing bathroom. install washer and dryer. no removal of structural walls.
-
Sep 2024
Miscellaneous brick repointing and brick repair (approx. 300 bricks) at exterior.
-
Jun 2025
One unit: 1. rehab existing kitchen. 2. rehab existing bathroom. 3. install washer and dryer.
-
Jul 2025
One unit: convert existing kitchen to study. relocate existing kitchen. rehabilitate existing bathroom. install washer and dryer.
-
Apr 2026
One unit: rehabilitate existing kitvhn & bathroom; install washer & dryer.
DBI holds 113 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 113. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early residents. This building is dated 1910 in the historical record; the assessor's roll gives the parcel a build year of 1911. Submit an update