100 Larkin Street
Nob Hill · San Francisco, CA 94102
-
Nov 1991
Erect a seven story public library-new main branch library.
-
Feb 1992
Excavatation.
-
1996
The James C. Hormel Gay and Lesbian Center opened in the San Francisco Public Library's Main Library in 1996.
-
Apr 2000
Interior renovation of personnel offices and gift shop on 2nd floor.
-
Mar 2005
Replace/repair motor of one fan. installing (2) 150 hp vfd drives.
-
Feb 2006
Scope consists of 1st floor renovation of main library. tenant improvments and installation of sorting machine, automated storage and retrievel machine by logistex (under different permit). no exterior work.
-
Jun 2007
Add 2 new vfd's to existing fans (sq ft-1 & sq ft-1a) in basement.
-
Dec 2013
Installation of demountable wall to separate 2 office departments. this wall will provide 18"min. clear opening at top throughout length of wll. wall will be equipped with power & data receptacles. elective disposal & or relocation accessories for ada upgrade.
-
Mar 2014
Tenant improvement for teen ctr at 2/fl. selective interior demolition ofexistingbldg, construction of new offices, sound booth, video recording booth, maker space(arts&crafts) single user restroom with updated mechanical, plumbing, electrical sys. fire sprinkler and fire alarm revisions under separate application.
-
Mar 2014
6th floor - demolitoin of existing offices, ceiling tile, & flooring. installation of new walls to create new offices, new carpet, gypsum board ceiling, & relocation of existing lights. new mechnaical supply & return grills to be installed. selective disposal &/or relocation of accessories for ada upgrade.
-
Apr 2014
Partial renovation 5th fl. work includes reconf of existing electrical, mechanical w0rk. installtion of new study rooms, office, copy room, break room & learning lab. installation of new finishes including flooring, paint & glaze. fire sprinkler & fire alarm under separate appln. n/a ordinance #155-13.
-
Jun 2014
Partial renovation of 6th floor office space. work includes installation of new walls, windows, and finishes. reconfiguration of existing electrical, mechanical. fire alarm and sprinkler system under seperate permits.
-
Apr 2015
Interior signage upgrade maher - not req'd.
-
Nov 2017
Install projector and motion sensor on top of library.
-
Apr 2019
Minor barrier removal and finishes, replacement associated with elevator modernization n/a maher.
-
Nov 2019
Basement/lower level only: selective demolition of partitions and ceilings. alterations to portion of existing floor plan, new partitions and ceilings. refurbish interior finishes, partial replacement of gypsum sheathing and paint throughout.
-
Dec 2020
Installation of glass partitions around 4/f atrium guardrails. life/safety issue.
-
Nov 2021
Non structural interior alterations, including selective demolition and new partitions, doors, ceilings, finishes and mep including lighting and hvac.
-
Jun 2022
Installation of a glass barricade for safety on the 5th floor bridge.
-
Feb 2024
Upgrade the 7 fire alarm system panels. add a cellular dialer, replace cards in existing annuciator and to replace initiating devices and modules at their existing location.
-
Sep 2025
Replacement of roofing membrane, replace sealant around skylights and curtainwall, replace plumbing drains as need on roof drains.
-
Dec 2025
Laminated glass safety barriers will be bolted to the existing metal guardrails.
-
Dec 2025
3rd & 4th fl - installation of laminated glass safety barriers around the central curved atrium floor opening at the 3rd & 4th fl of the main library. laminated glass safety barriers will be bolted to the existing metal guardrails.
-
Dec 2025
Installation of safety floor grilles at selected floor openings on 3rd and 4th floor of main library. floor grilles are a safety measure to prevent people from jumping off the existing guard rails.
-
Apr 2026
Removal of existing 42 atrium smoke exhaust fans and replacement with 42 new atrium smoke exhaust fans due to equipment obsolescence.
DBI holds 60 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 60. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. The assessor dates the building to 1900; Planning's historic resource survey records 1995. Submit an update