1528–1540 Pine Street
Nob Hill · San Francisco, CA 94109
-
1922
Recorded in the city's survey of the Van Ness Avenue automobile corridor as built for use as an auto repair shop.
-
Jun 1990
New parapet bracing.
-
Jan 1994
Demol existing impro basement & floor 1 seismic upgrade.
-
Apr 2003
Shorning & underpinning required due to adjacent new const bpn #200212042782s.
-
Jun 2007
Ten awnings.
-
2010
Evaluated in the city's survey of the Van Ness Avenue automobile corridor and given California Register status code 6Z — not individually eligible for the California Register.
-
Jul 2012
Non-structural demolition for future tenant improvement - remove skylights, roof deck, stair, partition, signage & awnings.
-
Aug 2012
Non-structural interior demolition for futre tenant improvements. access compliance will be provided under t.i. permit. space presently vacant.
-
Oct 2012
Interior demolition and renovation throughout building. including new stairs, new bathroom, new ramp to roof. sprinkler system & fire alarm under separate permit. new mezzanine, convert roof to occupied parking. (cost of sprinkler & fire alarm permit not included under this valuation).
-
Mar 2013
Revision to permit application 2012-1001-0986-revise roof plan.
-
Apr 2013
Revision to permit application 2012-1001-0986 & 2013-0322-2799-revise structural details only.
-
Apr 2013
Install equipment: (1) etl listed automotive paint spray booth into existing collision repair facility. sprinkler system under separate application.
-
May 2013
2nd floor -fire sprinkler expansion to make the entire building fully sprinklered to nfpa 13; 240 additional sprinklers - 2nd floor & under new mezzanine & new spray booth. also installed missing sprinklers on 1st floor. ref arch apn 201210010986 r-1.
-
Oct 2013
1)change occupancy of floor 1 from (b) as approved per app#201210010986/r to b (a-2). 2)remodel floor 1 restroom.
-
Nov 2013
Restroom remodel at first floor.
-
Jul 2015
Reroofing.
-
Jul 2022
At&t installation of temp facility consisting of: install 32'4" temp monopole with 6 panel antennas, 12 rrus on rooftop; temp equip. shetler on roof top containing 3 rrus, 2 surge suppresors, 1 dcpp rack with 3 strings 190ah batteries, 8 rectifiers, 2 racks with (2) 5216bbu & 2 xmu bbu; 1 new ac power panel.
-
Nov 2022
1/f & mezzanine - tenant improvement including new partitions, doors, ceilings, lighting, millwork, finishes & mep.
-
Nov 2022
2/f: t.i., new partitions, doors, ceiling, lighting, millwork, finishes, & mep. on the second floor, existing car lifts to be replaced with new lifts, weight to match existing equipment weight. structural work at second floor only.
-
Nov 2022
Basement t.i., new floor finishes, new interior wall finishes, electrical system, mechanical & plumbing.
-
Nov 2022
Roof - tenant improvement including new electrical & mechanical systems.
-
Dec 2022
Install temporary vinyl sign (vinfast).
-
Dec 2022
Install temporary vinyl sign (vinfast logo).
-
Dec 2022
Install temporary vinyl sign (vinfast).
-
Dec 2022
Install temporary vinyl sign (service).
-
Dec 2022
Install temporary vinyl sign (vinfast logo).
DBI holds 29 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 29. 2 of them are nominal $1 street-space or sidewalk permits.