1200–1224 Polk Street
Nob Hill · San Francisco, CA 94109
Permit history
-
May 1989
Install roof braces to parapet as per file no 2593.
-
Dec 1999
New front store.
-
Dec 1999
Reroofing.
-
May 2002
Street space.
-
May 2002
Seismic upgrade-bolts, plus with correction and handicap access work-upgrade of entrance doors at 1200.
-
Feb 2004
Extending or sprinkler lines in guest rooms in a fully sprinkler hotel to comply with s.r.o ordinanc.
-
Mar 2004
Remodel existing retail to sandwich shop.
-
Dec 2005
Install new awning, awning made of frame 1" and 3/4" canvas cover. awning attached to wall by lag screw.
-
Feb 2006
Add new outlets, add 220v outlet & plumbing piping, refre. at kitchen counter area.
-
Sep 2006
To install fire sprinkler system to comply with sfd corrections deated 03/09/04 app#200402055736 and ord. 170-02. comply with nov 200673307.
-
Jul 2007
Repair all deteriorated shower partitions throughtout as needed and toilets as needed. repair tiles as needed to comply. provide adequate lighting as needed to comply with nov. replace and repair as necessary. to comply with nov#200557356.
-
Nov 2007
Remove some existing awnings and install (17) new awnings, awnings made of 1" and 3/4" frame awnings cover with canvas awing attached to the wall by lag bolt 1/4" x 5".
-
Apr 2008
Repair all damaged shower partitions throught as needed. replace toilet as needed. repair ceramic tiles as needed & replace existing lighting damaged to comply. all work in residential units only. 3 bathrooms only. repair.
-
Sep 2010
Installing suppression system for existing hood #1 & system for hood #2.
-
Sep 2012
Change old ceramic tile floor at bathroom with new ceramic tile (100'), change old carpet floor to hardwood floor (300') patch all damage on drywall and new paint, approx 4".
-
Oct 2012
Upgrade entrance door to meet ada. new power door operators, new 3 compartment sink, new 1 hand sink, new quarry tile floor with quarry tile coer (kitchen area). new cafe shop, new limited restaurant.
-
Jan 2017
To comply with nov 201756319 existing plaster & lath walls removed & replaced with new 5/8" type x drywall on all exterior walls & ceilings to achieve 1 hour fire rating. remodel of restroom (all new drywall), new drywall at mezzanine, new electrical & plumbing.
-
Feb 2017
For storage space only, ada upgrades from alley, replace window, add ventilation at new storage room.
-
Aug 2017
Revision to permit application 201701278151 and #201705126417. ti remodel of interior finishes only. installation of pre-engineered glass conference room, plywood wall, furnishing, plywood work surface & acoustic privacy screen.
-
Nov 2017
Permitting of lighting layout for ground level commercial ti ref pa 2017-0811-4640.
-
Mar 2018
Renew expired permit application 201701278151. to obtain final inspection for work approved under permit application 201701278151. all work is complete.
-
Aug 2018
Upgrade entrance door to meet ada. new 3 compartment pot sink. new hand sink. new quarry tile floor with quarry tile cove (kitchen area) this bld is a residential hotel. units may not be converted, demolished or have their use changed without complying with chapter 41 sq ft admin code.
-
Dec 2018
Like for like fire system replacement with new control panel, smoke detectos & pull stations at the same location. install new radio communicator, monitor module for exist. flow switch tie-in exist. bells to new panel. will comply with new sffc by 2021.
-
Dec 2019
In-kind replacement of broken window with wood frame window. to comply with 201981505.
DBI holds 40 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 40. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update