1436–1446 Polk Street
Nob Hill · San Francisco, CA 94109
Permit history
-
Dec 1986
Clean up inside, remove bar & fixtures.
-
Feb 1987
Demolition done under 8615740 clean up interior to make.
-
Jul 1987
To erect electrical sign.
-
Feb 1989
Parapet reinforcement.
-
Aug 1989
Tenant improvement per drawings.
-
Nov 1989
Penalty for work done without permit.
-
Nov 1989
Install awning prefabricated by owner.
-
Jun 1991
Attach 5/8" plywood laminated oven existing walls.
-
Sep 1994
Comply with umb ordinance.
-
Aug 1995
Construct store front restrooms and entry way.
-
Apr 1996
To erect 2'0" high x 18'0" long wall sign.
-
Jun 1996
Construct drywall partitions using metal studs & sheetrock.
-
Aug 1996
Fabricate & install awning over storefront/frame work.
-
Jul 2000
Add an automatic ada compliant door opener to entrance doors.
-
Jan 2001
Demolition walls, build new 1 hr rated corridor to (r) exit, modify real exit doors, existing restrm, front ent.
-
Oct 2006
Comply with notice of violation/complaint #9900210 order of abatement 5965a/ab#011 ap#012 use of /provide automatic door operator for front entrance with push pad both side in lieu of level landing and side clearance.
-
Jan 2011
To comply with planning requirements for record purposes for existing billboard.
-
Aug 2011
Reroofing.
-
Jun 2012
A new unmanned telecommunication facifity consisting of new rooftop antennas & a new 178 sq ft. at & t lease area with new at & t equipment.
-
Apr 2013
Comply with nov #201282468-barrier removal-remove atm at front entry of subject tenent space per plan.
-
May 2022
Demolition of a 2 story commercial building, parking lot.
-
Nov 2023
Comply with ord 51-16 accessible business ordinance program. abe #202001160959. remove & replace entry sidewalk in order to get a 2% max cross slope as needed.
-
Nov 2023
Technical infeasibility or unreasonable hardship per ord 51-16. abe #202001160960. remove & replace entire sidewalk in order to get to 2% max cross slope as needed.
-
Jun 2026
T.i of kickboxing gym. provide new toilets, showers and drinking fountains. provide new tankless water heater.
DBI holds 33 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 33.
Not yet documented: the architect and builder and the early tenants. Submit an update