901 Powell Street, Unit 1
Condominium unit
-
Mar 1982
Additions alterations or repairs.
-
Jul 1988
Remove black cement clean rust.
-
Jul 1988
Install 16 new windows.
-
Apr 1989
Install ramp from powell to basement for auto access.
-
May 1989
Reroofing.
-
May 1989
Kitchen remodel, remove/replacecabients, no structural work.
-
Jun 1989
Kitchen remodel, cabinets fixtures, no partitions moved.
-
Jan 1990
Interior renovation of a kitchen, bath & mis. carpentry.
-
Sep 1991
Install single fire sprinkler at elevator in garage.
-
Sep 1991
Add bedroom & bath, per plan. hang new kitchen cabinets.
-
Oct 1991
Replace kitchen appliances in#14 only.
-
Dec 1991
Hook up kitchen appliances, tiling & counter top.
-
Apr 1992
Remodel apt.l #1 remdoel kitchen bath, new partitions.
-
Jun 1992
Remod 2 baths-kitchen, appl, cnttops-no structural.
-
Oct 1996
Repair & epoxy injection per plans.
-
Aug 1999
Expose steel beam/repair & replace as needed/patch masonry.
-
Jul 2023
Kitchen: replace cabinets, countertop, kitchen plumbing fixtures in kind, add hood exhuast vent, reconfigure patio doors. add refrigerator circuit, 240v oven circuit, refrigerator ice maker line. paint. no structural demolition. terminate 3' from pl & openings into the building, not discharge public walkway.
DBI holds 26 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 26. 7 expired or cancelled permits are not shown.