1000 Sutter Street
Hotel
-
August 14, 1907
Berger Manufacturing Company contracted for metal lathing on the La Granada hotel, at $6,150.
-
1908
Built.
-
February 14, 1908
W. P. Fuller company and Lowry & Daly contracted to put up a building, at $7,790.
-
October 1971
The Granada hotel was operating as a residential hotel in standard condition; an October 1971 Redevelopment Agency survey of potential relocation housing counted 200 units, one of them vacant.
-
Jul 2003
Remove & replace concrete structural slab & portion of topping slab over sub sidewalk bsmt.
-
Jul 2016
One room bath remodel. comply with ces 201672438; no structural work, in kind. no extra plumbing fixtures added. maher not req.
-
Oct 2019
Two units. one unit -bathroom remodel and painting. one unit -replace vanity sink and paint. no layout changes in either unit.
-
Nov 2019
Remove all existing single-hung wood window sashes. street facing window sashes (321) will be replaced with new wood, single-hung windows in same openings (marvin ultimate wood tilt pack). 43 windows in existing lightwell not visible from street will be replaced in same openings with new vinyl windows.
-
Jan 2020
Reroofing. removal of existing; replace all metal flashing; apply modified bitumen with mb base; clean and haul all debris off the site.
-
Jan 2020
Remodel (like for like) 1 bathroom in each unit, @ four units.
-
Jan 2020
Remodel (like for like) 1 bathroom in each units, @ four units.
-
Jul 2021
Voluntary replacement + upgrade installation of fa system. install of new facp, aes, power supplies, remote, annuciator, monitor modules, smoke detectors, heat detector, pull station, relay modules, horn strobes, trobes, and combo smoke detecto with lf horn to meet sffc2019- sec1103.7.6.1.
-
Sep 2021
100% new affordable housing, renovation of a 10-story existing sro into housing for homeless & impacted by covid-19. elective/discretionary structural upgrades at basement foundations & exterior building envelope; renovate residential units; add/renovate offices, community room, laundry & restrooms.
-
Aug 2022
Replace fire pump. ti work in basement and lobby (add + relocate sprinklers) adjust sprinklers in rooms and bathroom on residential floors. ref permit 202109138252.
-
Oct 2022
Replace firepump, relocate and add sprinklers in basement and lobby. relocate sidewalls in lobby in all residential floors. relocate and add heads in restrooms.
-
Feb 2023
Revision to approved permit #202109138252. convert existing commercial grade kitchen to residential grade warming kitchen @ lobby level 1, community kitchen only include adjacent prop mgmt ofc.
-
Jun 2023
Revision to pa 2021-0913-8252 residential unit plumbing pipe replacement including plumbing fixtures. "no residential guest rooms will be removed or demolised or converted".
-
Aug 2024
Install emergency responder radio coverage system (errcs).
-
Nov 2024
Add/relocate 27 sprinklers. associated with building permit application 202109138252.
-
Jan 2025
As built drawings for our dining room scope of: adding/relocating fire sprinklers revision to permit#2024-1119-5278.
-
Feb 2025
As built drawings from prior permit 202210053786 fire pump, sprinklers in basement, lobby, upright closets, public restrooms. add additional 50 heads (31 pendant, 19 sidewalls).
-
Apr 2025
As-built: fire alarm: change log updated the basement and g/f layout and added several notification devices on those floors. ref 202107164499 & 202109138252.
DBI holds 59 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 59. 12 of them are nominal $1 street-space or sidewalk permits. 7 expired permits are not shown.
Nearby
- 999 Sutter Street Same street
- 1006–1008 Sutter Street Same street
- 1034 Sutter Street Same block
- 835 Hyde Street Same block
- 1040 Sutter Street Same block
- 845 Hyde Street Same block
- 824 Hyde Street Around the corner
- 729 Hyde Street Around the corner