Permit history
-
Apr 1984
Comply with bbi complaint # 21715.
-
Jul 1987
Parapet strengthening.
-
Oct 1987
Parapet reinforcing.
-
Mar 1993
Reroofing.
-
May 2000
Retrofit of unreinforced masonry building.
-
Apr 2001
Revision to app #200005049077.
-
Jan 2002
Bath, kitchen rmdl, plstr rmvl/replace 12 units no structur.
-
Jan 2002
Umb/seismic retrofit works.
-
Apr 2002
Street space.
-
May 2002
Minor remodeling/plaster removal/cbnts in one unit.
-
Jul 2005
Remove illegal unit work back to storage comply with housing nov 200008852.
-
Aug 2011
#404 replacement of kitchen cabinet, toilet, bathroom sink, varnish hardwood floor, fix 1 window in bathroom, paint and re-glaze bathtub. kitchen: min. 50% of light wattage to be h.e.; bath: h.e. light or "manual on" o.s.
-
Aug 2017
One unit: remodel 1 bathroom: new tile & fixtures, remodel kitchen floor (tile only), update electrical to code, update plumbing to code, add washer/dryer in existing closet. no structural work.
-
Aug 2017
Reroofing.
-
Apr 2018
Relocate living rm, relocate bedroom, rehabilitate existing kitche, rehabilitate existing bath, install washer dryer.
-
May 2019
On 3rd floor - one unit - convert existing kitchen to office, relocate kitchen, rehabilitate existing bathroom and install washer & dryer.
-
Oct 2019
One unit: 1) remodel existing kitchen & bath like for like. 2) replace existing 125a subpanel 3) add electric stacked washer & dryer to closet.
-
Oct 2019
One unit - convert existing kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom and install washer/dryer.
-
May 2020
One unit: convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer/dryer.
-
Oct 2020
Addition of two (2) accsessory dwelling units to an existing nineteen (19) unit building per ordinance 162-16 for a total of twenty one (21) units. the two (2) proposed dwellings are located within the existing building envelope at the basement level. **maher n/a**.
-
Jan 2021
One unit: rehabilitate existing kitchen & bathroom. install washer & dryer in existing closet. (no moving walls).
-
Oct 2021
Upgrade the existing fire alarm system to meet current codes 2019 cbc/cfc and nfpa 72-2016 by installing new wireless low frequency sounders in all sleeping areas.
-
May 2022
One unit: install one new clothes washer and dryer. note: no structural wall demolition.
-
Jul 2022
One unit: install one new clothes washer and dryer. no structural wall demolition.
DBI holds 32 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 32. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update