37.7893, −122.4089 A locator map appears here once a Mapbox token is configured.
Know This Place

District 3 · Block 0284, Lot 004 · ZIP 94102

500 Sutter Street

Office building

  • 9 stories
  • 55,414 ft2
  • 8,718.75 ft2 lot area
  • Zoned C3R
  • Historic resource
37.7893, −122.4089 Street View appears here once a Google Maps embed key is configured.
  1. October 6, 1913

    McLeran & Peterson contracted to put up an eight-storey class A steel-frame office building, at $215,000.

    The San Francisco Call, 6 October 1913, p. 5
  2. 1914

    Built.

  3. Jul 1981
    Filing Permit 8106497 $$$ $20,000

    Additions alterations or repairs.

  4. Dec 1981
    Permit 8110799 $$$ $400,000

    Additions alterations or repairs.

  5. Nov 2004
    Permit 200411129039 $$$ $1,000

    One unit - remove non compliant exit signs, install exit sign, install rated storage closer door, to remove nov# 200450829. legalize entire remodeled unit. install new xray & med gas storage closet.

  6. Dec 2005
    Permit 200512029395 $$$ $400,000

    Fire alarm replacement on all floors: 1 addresssable fire alarm control panel, 1 manual pull station, 7 control relays, 4 single input monitor modules, 19 dual input monitor modules, 75 smoke detectors, 4 heat detectors, 155 horn/strobes, 92 strobes.

  7. Apr 2011
    Permit 201104073663 $$$ $255,000

    4th floor ste 430 -demolition of existing offices. build out of new offices.

  8. May 2017
    Permit 201705116335 $$$ $182,000

    2nd floor, spec suite 204 - demolition of non-structural partitions and medical equipments. tenant improvement include construction of non-structural partiions, ceilings, lights & finishes includes accessibility upgrades, mechanical, electrical & plumbing.

  9. May 2017
    Permit 201705116330 $$$ $71,000

    2nd floor, spec suite 201 - demolition ofnon-structural partitoins, millwork & medical equipments. tenant improvement include construction of new non-structural partiions, ceilings, lights & finishes includes electrical & plumbing.

  10. Jun 2018
    Permit 201806131743 $$$ $95,000

    Suite 815: demolition existing non-struct partitions, doors, casework & associated plumbing fixtures, wall & floor finishes, ceiling system & lighting. construct new non-struct partition, door, glazing, finishes, cieling system & lighting. restroom access. impovements include removal & re-installation of existing.

  11. Aug 2018
    Issued Permit 201808016103 $$$ $500,000

    Installing a roof mounted powered davit carriage and track system for building maintenance & repairs. the upper mansard will be impacted; the parapet will be extended for concealment purposes & for osha requirements. a safety rail immediately behind the parapet will be installed.

  12. Jan 2019
    Permit 201901140268 $$$ $185,476

    Suite 823. minor demolition of existing wall, casework, finishes. existing ceiling to remain with new light fixtures throughout construction incl non-structural partitions, doors and finishes. restroom accessbility upgrades ref permit application 201806131743.

  13. Sep 2022
    Filed Permit 202209273203 $$$ $1,500,000

    Facade repairs including brick, terracotta, wood windows and metal cornices.

  14. Apr 2023
    Issued Permit 202304135656 $$$ $25,000

    This is a revision to permit application 201904198449. revised discharge duct from exhaust fan to run from low roof to street level in lieu of utilizing existing vertical duct along the side of the building. existing vertical duct to be demolished. exhaust will discharge a min of 10" above grade. revised termination of gas wate.

DBI holds 133 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 133. 8 of them are nominal $1 street-space or sidewalk permits. 13 expired or cancelled permits are not shown.

Nearby