726–750 Sutter Street
Nob Hill · San Francisco, CA 94109
Permit history
-
Jan 1982
Additions alterations or repairs.
-
Jan 1982
Additions alterations or repairs.
-
Apr 1986
Replace storefront windows/demolition storage room for florist.
-
Jul 1990
Addition of basement office space to residential building.
-
Mar 1993
Toilet alt. to convert 13 existing guest rm into 10 accessible.
-
Sep 1993
Delete doorway & telephone table.
-
Mar 1994
Fire protection work floors 2-10.
-
Nov 1994
Renovation of banquet room & path of travel.
-
Oct 1995
Addition of handicapped access lift, partions, entry door.
-
Mar 1999
Demolition of hollow clay block walls & upgrade all mtl stds.
-
May 2000
Renovate guest services area. new accessible restrooms, managers ofice, concierge area, exercise rm.
-
Aug 2000
Street use.
-
Dec 2000
Rev. to permit application 2000/05/08/9372-revised construction cost-women's restroom -rev. kitchen walk-in.
-
Sep 2001
Reroofing.
-
Mar 2004
Fire alarm system replacement & upgrade to meet current code.
-
Jan 2005
Accssble upgrades; new guest suite, upgraded guest rm.
-
Jan 2007
Demolition of non struct. partition walls demolition of north stair demolition of south ships ladder fire escape demolition of lightwell skylight between cant. hotel and whitehall inn partial demolition of green house roof and walls north of whitehall inn at 1st floor (building is vacant/space).
-
Mar 2007
Remodel of the canterbury hotel and whitehall inn, including a seismic retrofit at whitehall, seismic strengthening at canterbury, and remodeling hotel rooms at both buildings into one- bedroom units and larger suites, all with full kitchens.
-
Apr 2007
Demolition non-structural partition walls&exterior brick walls for restoration ofexistingwindows in courtyard.select demolition at 1st floor & renovate lobby.removal window hung hvac units&in-fill panels.restore glazing.select demolition at bsmt level.demoexisting mechanical/electrical/plumb where noted.
-
Nov 2008
Revision to addendum permit application 2007-0307-5620s (architectural addendum)-replace 2 existing elevators with 1 new elevator. scope of work schall be identified as follows: architecture delta 5.
-
Feb 2009
Revision to superstructure addendum #2 (2007-0307-5620/s2). provide structural & architectural (4 hr fire rating) details for 4hr seperation.
-
May 2009
Addition of 1 new 5 ton packaged rooftop ac unit and associated duct work to service existing one-story space.
-
Aug 2020
Reroofing permit. comply with cool roof requirements.
-
Sep 2020
Service fans and existing heating boiler and cooling tower. replace existing air handling units, condenserwater circulation pumps, expansion tanks, domestic boilers & storage tanks, and fan coil units with equivalent units.
-
Jan 2023
7 units to be upgraded for accessbility standard. 12 units to be upgraded for person with hearing & visual impairmants. existing common areas on 1st fl to be updated. no catering/ no shared kitchen.
DBI holds 66 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 66. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the year the building went up, the architect and builder, the early tenants and the date of the last recorded sale. Submit an update