2031–2037 Castro Street
Noe Valley · San Francisco, CA 94131
-
1973
Designed by Jeno E. Lorincz on a steep site nearly three hundred feet wide in Noe Valley.
-
Dec 1999
Repair rear stairs & railings.
-
Sep 2006
Replace damaged siding and trim at rear of building 200 sq ft approx.
-
Sep 2007
Replace damaged wood siding and trim as needed at rear of building approx 200 sq ft.
-
Nov 2013
Replace approx. 600 sq feet of plywood siding on west side of building.
-
Apr 2016
Replace and repair all dry rot on decks and stairs. south side (rear) of building. - repair or replace less than 50%.
-
Mar 2017
Repaire of existing rotten deck areas in kind.
-
Apr 2017
Reside existing building - 2035 & 2037 back side. 1/2" densglass sheetrock and 5/8" duratemp plysiding waterproof decks. 4 deck levels.
-
Oct 2019
To obtain permit for work approved under permit application 201604185001. all work is complete.
-
Aug 2023
Upgrade existing fire alarm system by replacing it with 1 fire alarm control unit, 1 wireless communicator next to facu (1) led annunciator, 9 addressible smoke detectors, 8 addressible manual pull station, 4 outdoor manual pull station, 4 addressible monitor module, 1 addressible dual monitor module.
-
Nov 2023
Upgrade existing fire alarm system by replacing it with 1 fire alarm control unit, 1 wireless communicator next to facu, 1 lcd annunciator, 9 addresable smoke detectors, 8 addressable manual pull station, 4 outdoor manual pull station, 4 addressable monitor, 1 addressable dual monitor module, 1 addressab.
-
Feb 2025
Emergency repair of underground leak of fire main. initial pipe replacedd revealed more pipe to be corroded, pipe repaired until pressure test passed.
-
Oct 2025
One unit- 2nd floor remodel to include new laundry, bathroom, and closet. no change to use, exterior, egress or addtional square footage.
-
Oct 2025
One unit: interior renovation on 3rd floor: new laundry. no change to use, exteriors, egress or unit area, and no structural. 2 bathroooms remodel in-kind.
-
Oct 2025
Interior renovation to 1 one unit on 3rd fl. new laundry. no change to use, exterior, egress or unit area. non structural.
-
Oct 2025
2/f - one unit: interior renovation. new laundry. no change to use, exteriors, egress or unit area. no structural.
-
Oct 2025
One unit: interior renovation to one unit on the 3rd floor: 1 new laundry. no change to use, exteriors, egress or unit area and no structural.
-
Oct 2025
One unit interior renovation on 3rd fl. new laundry, closet & bathroom. no change to use, exteriors, egress or unit area. no structural.
-
Oct 2025
One unit: new laundry, new bathroom & new closet. no change of use, exteriors, egress or unit area. no structural work.
-
Jan 2026
One unit: to comply with violation# 202548653: one unit - kitchen countertop r/r like for like bathroom vanity & countertop replace like for like.
-
Mar 2026
One unit revision to this permit# 202510147317: this permit is to add a shower to an existing bath.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the developer, the early residents and the date of the last recorded sale. Submit an update