Store building · North Beach
-
September 1952
North Beach Place, a public housing project designed in 1941-1942 by Henry Gutterson and Ernest Born, with landscape by Thomas Church and structural engineering by August V. Saph, opened its first units; delayed by the war, it was built in 1950-1952 by Leo Epp, Inc. on two blocks the city had taken by eminent domain, whose warehouses, flats and the Cable Car Restaurant were demolished in March and April 1950.
-
October 1952
When the Housing Authority refused three qualified African-American families at North Beach Place under its "neighborhood pattern" segregation policy, the NAACP sued, and a Superior Court judge ruled the policy unconstitutional; the State District Court of Appeal upheld the ruling in August 1953 and the State Supreme Court in October 1953.
-
December 2001
Demolition of the 1952 North Beach Place began on the east block in December 2001 and was finished on the west block in January 2003, for a HOPE VI rebuilding by BRIDGE Housing, the John Stewart Company and Em Johnson Interest.
-
Mar 2002
Erect 3 story 42-unit apartment building.
-
Mar 2002
Erect 1 story parking & comunity retail spac3.
-
Sep 2002
Demolish 3 story residential apartments (west block).
-
Jun 2003
Install underground supply piping for fire sprinkler systems from prop line to finished floor.
-
Jun 2003
Install new sprinkler system into new building total heads: 403 per nfpa 13 ord i & ii garage building nine.
-
Feb 2004
Install 332 sprinklers in new system in building #10 per 1999 nfpa 13r.
-
Sep 2004
Interior tenant improvements for retail sotre new partitions, suspendedceiling, flooring counters.
-
May 2005
Rev. to site permit #2002/03/06/0755-s3 to revise the parking configuration at the underground garag.
-
Jan 2006
Replace existing atm with a new atm and enclosure, sprinkler under separate permit.
-
Apr 2006
Add one new ssp at new atm room per new construction from existing system.
-
Dec 2007
First time t.i. for new ballet school studio. work includes minor demolishion, drywall work, new finishes, flooring, furniture etc. mep and fire protection under separate permit.
-
Apr 2010
Manufacture and install 1 4x4x18 yellow awning with digital print graphics.
-
May 2010
Extranomical tours (lettering 14.31"x195.90").
-
Sep 2021
Relace 3 canopy mounted fixtures, install 6 wall mounted fixtures, install new condit and wire to new fixtures.
-
Feb 2022
One unit. remove all wall board and replace flooring, cabinets and insulation replaced. entire unit. sfebc applies (503.11.1) non structural.
-
Sep 2023
Repurpose existing e3 multi-purpose room into a i4 classroom, consisting of nap area, diaper changeing area for infants ages 0 to 2. add an ada all gender adult restroom.
-
Jun 2024
Relocate 8 pendent fire sprinklers as required by tenant improvements. all existing fire sprinklers, branchlines, main piping beyond the area of work to remain.
-
Jul 2024
Modification to existing fire alarm system. relocate existing horn strobe from diaper/toilet area to classroom. ref to bpa# 202309186822 arch plan.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline. 5 expired permits are not shown.
Parcels
3 parcels on the assessor's roll, 5,744 square feet between them. Each has a page of its own: its assessed value, last sale and permits.
- 567 Bay Street
- 501 Bay Street2,451 sq ft
- 511 Bay Street3,293 sq ft
Nearby
- 488–490 Bay Street Same street
- 611 Bay Street Same street
- 1111 Columbus Avenue Same block
- 2594–2598 Taylor Street Around the corner
- 2552 Taylor Street Around the corner
- 1050 Columbus Avenue Around the corner