534–540 Broadway
Hotel
-
July 9, 1909
Fowler wrecking company contracted to raze the buildings on the lot, leaving 60,000 cleaned bricks, at $1,000.
-
1910
Built.
-
October 1971
It traded as the Swiss American, a 75-unit residential hotel; eight units stood vacant.
-
Aug 2003
2nd & 3rd fl- heads fire sprinkler system, total 180 heads.
-
Jul 2009
Bathroom remodel, remove tub, pan & replace with shower pan. 1 bathroom 3rd floor only.
-
Oct 2009
Bathroom remodel, rework tubs & replace with shower pans, 2 bathrooms on 2nd & 3rd floors. sro common bathroom. work in 534 broadway.
-
Feb 2010
Bathroom remodel on 2nd floor. replace tub with shower pan and replace in kind on shower of mens common shower room. high efficacy lighting or occupancy sensor. no change to exhaust sytem.
-
Oct 2015
Add attic insulation to existing. r-40 equivalent.
-
Dec 2017
Like for like fire system replacement with new countrol panel, smoke, heat detectors & pull stations at the same location on 2/f & 3/f. tie-in existing bells to new panel. install monitor moudles to tie-in existing flow & tamper switches.
-
Mar 2018
Roof replacement with new pvc roof (reroofing). replacement of five existing skylights.
-
May 2018
Replacement of double hung windows in kind and 2 transories. replacement of stucco facades in kind, add plywood sheathing. remove area of dry rot. add roof access ladder per sffd. temporary rear stair repair under permit application 2016-0428-5949. plan shown exiting (temporary) on 2nd & 3rd floors.
-
Jun 2018
Add 2 remote power supplies, 656 low freq horns, 6 strobes, 4 horn/strobes weather proof, 1 indoor horn strobe to e system ref 201712217143.
-
Aug 2018
Exterior roof access ladder from third floor at rear of building.
-
Sep 2018
**residential**. ab-004 housing project. soft story retrofit 2016 cebc appendix a-4 (residential).
-
Sep 2018
Commercial. ab-004 housing project. soft story retrofit 2016 cebc appendix a-4 (commercial).
-
Nov 2018
Foundation cap at north west side to correct wood near or below grade (180').
-
Jan 2019
New resilent flooring and paint in 15 units. add 3 sinks in 3 one unit/311, replace existing intercom panel and provide new card reader at front door.
-
Feb 2023
Revision to permit application 201809140157. these soft story permit previously separated storefront work trigged by the da checklist from the permits. this report was made by dbi, then dbi asked taht the scope be combined into this permit. scope now include storefront modification required to creat an accessible.
-
Nov 2025
Relocate restrooms & laundry rm, replace finishes throughout, replace rehab windows, rehab units. final completiion only after permit application 202503101910 final completion.
-
Sep 2026
Revision to bpa: 202511069121 - replace interior doors, door frames to remain. provide self closing hinges, ada compliant hardware and smoke gasket. relocate electrical panels.
DBI holds 39 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 39. 3 of them are nominal $1 street-space or sidewalk permits. 7 expired permits are not shown.
Nearby
- 530 Broadway Same street
- 546–554 Broadway Same street
- 15 Romolo Place Same block
- 500–508 Broadway Same block
- 1143–1147 Kearny Street Same block
- 549–551 Vallejo Street Same block
- 270 Columbus Avenue Around the corner
- 261–271 Columbus Avenue Around the corner