1300–1326 Grant Avenue
North Beach · San Francisco, CA 94133
-
1982
Recorded in the city's 1982 survey of North Beach, adopted by the Board of Supervisors in 1999, as a contributor to the Upper Dupont Street / Grant Avenue District.
-
Aug 1984
Construction of an awning at storefront above sidewalk.
-
Aug 1987
Install full service cafe restaurant, open kitchen.
-
Jan 1988
Install restaurant exhaust hood & grease flue blower & fan.
-
Aug 1990
Reroofing.
-
Dec 1992
T.i. into coffee hse. upgrd floor, wall, ceiling finishes, eac.
-
Jun 1998
Restaurant repairs.
-
Aug 1998
Bew type one hood and one new type two hood, welded duct.
-
Mar 2000
Correct all items, comply with nov.
-
Aug 2007
Reroofing.
-
Mar 2008
Two units - kitchen and bath remodel, no structural cabinets, tile, counter, flourescent light. min 50% of kitchen light wattage must be fluorescent. fluorescent light on occupancy sensor in bathroom.
-
May 2008
Work @ two units only. 2 kitchen & 2 bath remodel. no structural work. existing lighting to remain.
-
Dec 2009
Tenant improvement. interior remodel. sheetrock at kitchen wall. ada upgrades at restroom. upgrade electrical, plumbing fixtures. new restaurant kitchen equipment and lighting fixtures.
-
Dec 2010
New hvac, restaurant permit application 200912092955.
-
Apr 2015
Comply with nove #201257822. retail food sale, coffee & tea. acessible entry & restroom. tenant improvements. ref: conditional use app #201500389400.
-
Aug 2015
Limited restaurant - ti improvements for new food prep, retail area dn accessible restroom.
-
Jan 2016
Renovation of storefront commercial space for use as a retail bakery space. installation of display counters, hand washing sink, 3 compartment sink, electric bakery oven (warming) & refrigerated drink displays, modify entrance & add door openers.
-
Jun 2016
Install heating, ventilation and hood type 1 system.
-
Oct 2016
Electrical title 24 only ref permit application 201602089056.
-
Oct 2016
Install fire suppression system to a 10' hood & duct ref pa 2015-0821-5019.
-
Sep 2023
To comply with abe program/ord 51-16, technical infeasibility or unreasonable hardship/ord 51-16, abe #202306067485. replace existing entry door in-kind, new automatic push button door opener @ entry interior/exterior.
-
Sep 2023
To comply with abe program/ord 51-16, technical infeasibility or unreasonable hardship/ord 51-16, abe #202306067486. replace existing entry door in-kind, new automatic push button door opener.
-
Sep 2023
To comply with abe program/ord 51-16, technical infeasibility or unreasonable hardship/ord 51-16, abe #202306067487. replace existing entry door in-kind, new automatic push button door opener @ entry interior/exterior.
-
Sep 2023
To comply with abe program/ord 51-16, technical infeasibility or unreasonable hardship/ord 51-16, abe #202306067488. swap door swing orientation on existing entry door & provide new automatic push button door opener @ entry interior/exterior.
-
Sep 2023
To comply with abe program/ord 51-16, technical infeasibility or unreasonable hardship/ord 51-16, abe #202306217489. new handrails on both sides of existinginterior ramp, new automatic push button door opener @ existing interior ramp landing.
-
Dec 2025
Renovation of e bar into new restaurant. project includes new plumbing and equipment. no structural work or electrical work.
DBI holds 45 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 45. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update