1525–1529 Grant Avenue
North Beach · San Francisco, CA 94133
-
1911
Built to the design of John A. Porporato, whose North Beach work the city's survey documents.
-
1927
A speakeasy of about six hundred square feet operated in the basement of this building, beside a bocce ball court; the premises later became Mooney's Irish Pub.
-
Oct 1972
Created during job card conversion on: 04/19/84.
-
1982
Recorded in the city's 1982 survey of North Beach, adopted by the Board of Supervisors in 1999, as a contributor to the Upper Dupont Street / Grant Avenue District.
-
Aug 1982
Building use: hotel/retail.
-
Dec 1982
Fire damage no sturctural.
-
Apr 1983
Total interior rehabilitation.
-
Feb 1984
Install new 3" fire sprinkler thruout building.
-
Jun 1984
Create an office/fire sprinklers/new electrical.& plumbing.
-
Aug 1984
Erect approx.. 55 lineal feet of non-bearing partition walls.
-
Sep 1984
New roof deck with screen wall, arber, & planters.
-
Dec 1984
Install fire sprinkler for basement & 1st floor.
-
Mar 2004
To comply sro hotel retroactive sprinkler installation ordinance 170-2 alleration the 0 4" existing.
-
Jun 2004
Add communicator to monitor existing water flow device.
-
Jul 2009
Install new double-sided, non illuminate projecting sign.
-
Oct 2011
Replace existing finishes with new, replace in kind with new shower, toilets and sinks for common area residential restrooms (bathroom remodel).
-
Nov 2011
Reroofing.
-
Jun 2013
To comply with ordinance 029-13 only- installation of grab bars in sro at the following locations. grab bars install for toilet rooms. 2 toilet rooms for each floor. total of 4 toilet rooms.
-
Sep 2018
(residential). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4.
-
Sep 2018
(comemrcial). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4.
-
Oct 2020
100% affordable 34 sro units full non.structural rehabscope includes: new paint, flooring, fixtures, lighting, hardware in common area and units. mep duct work.newretrofit windows on floors 2&3. wood on grant side & clad on cadel place. exterior paint no work performed in the public right of way.
-
Jun 2022
Fire only: modification of existing sprinkler monitoring system to accomodate 2 hi rooms. 33-l and 5-c. this will requre us to replace the existing facp & all existing devices. we will be installing nw lf horns in all residential units & nw sounders, and strobes, sd, and co detectors in the h.i. rooms.
-
May 2023
Revision to bpa#202010217056, common shared kitchen revisions on 2/f & 3/f, change appliances, shelving, sink type from original permit. no residential guestrooms will be removed.
-
Sep 2023
Ground fl. pendents to be switched to ur 1st fl. pendents to be flipped to ur add (1) in 2nd & 3rd fl. hallwlay.
-
Oct 2023
Revision changes permit application 202206095963, per meeting with sffd we ae making the following changes, add 3 strobes @ 1/f, add 5 horn strobes @ 1/f, add 2 horn strobes @ basement, add remote annunciator @ 1/f, removed all mps except 1 @ the facp, add maps @ remote annunciators @ annunciators.
-
Dec 2023
Evacuation maps fabrication & installation (1st, 2nd, 3rd fl).
-
Jan 2024
Revision to approved soft story permits 201809140185/1079. includes removing and replacing concrete sidewalk at public right of way and infilling 2 existing vaults under sidewalk.
DBI holds 27 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 27. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update