725–731 Grant Avenue
North Beach · San Francisco, CA 94108
-
Oct 1992
Reroofing.
-
Sep 1999
Seismic upgrade.
-
Mar 2000
Revision to 9918581.
-
Jun 2002
Rev. appl#200003225082 enlarge restrooms.
-
Mar 2004
Reroofing.
-
May 2008
Truss repair.
-
May 2009
Upgrade automatic fire suppression system to the cooking hood using ansul ul 300 system.
-
Mar 2015
Interior non structural partition and wall demolition for future. remodel 2nd floor restaurant. n/a for the maher. separate ti permit. ab-017 applies.
-
May 2015
Interior remodel of an existing a-2 occup restaurant on single floor only on grade at waverly place(building 2nd floor). no exterior changes to facade at grant ave, add new on grade storefront to facade at waverly pl. n/a for the maher.mep, fire alarm and kitchen hood suppression syst under separate appl.
-
Aug 2015
2nd floor: install hvac system. install 2 type i hoods, 1 type iii hood with exhaust fan and make up air unit. and t-24 compliance. maher na.
-
Nov 2015
Install new fire alarm control unit on 2nd floor. install notification appliances & initiating devices thru-out floor area for full coverage. install pull stations at every exit & monitor modules to tie-in ansul system & duct detectors for monitoring. ti permit application 201505186610. n/a for maher.
-
Mar 2016
Install fire suppression system to a 25' hood & ducts. n/a ordinance #155-13.
-
Jun 2016
Demolition only to include - 'finishes only' - remove carpet, 12' bar, back bar cabinets, linoleum floors, wall tile, ktichen cabinets and equipment, decorative trim, non bearing partitions, drop ceiling, partial sheetrock. maher na.
-
Sep 2016
Streetspace.
-
May 2017
Interior remodel of existing restaurantat 3/f, work includes remodel of kitchen, new bar, remodel of dining and restroom. no exteror work. n/a ordinance #155-13.
-
Jan 2018
Revision to 201705035528: installation of 8 panel sliding door system at banquet dining room. structural work to include new beams and post to support doors. maher na.
-
Jan 2018
Repair/replace toilet sewer pip and repair bathroom light on ground floor.
-
Dec 2018
To comply with nov 201874061 & 201874201 ti to existing retail space. upgrade 1 ada bathroom & new floor finishes.
-
Dec 2018
3rd floor - modify existing fire alarm system to include notification and initiating devices for 3rd floor addition. ref permit application 201705035528, ref fire permit application 201801128514.
-
Feb 2019
Install ul300 ansul fire system to protect kitchen hood and cooking equipment. ref permit application 201705035528.
-
Apr 2021
Replace existing roll-down door with manual-operated perforated chain link roll-down door.
-
May 2021
Install new roll down door at grant avenue entry with mechanism hidden inside wall and the gate is 75% open metal link.
-
Jun 2025
To obtain final inspection for work approved under permit application 201505186610. all work is complete.
-
August 28, 2026
A tiny café from Mister Jiu’s and a rising coffee star arrives in S.F. — San Francisco Chronicle
13 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update