580 Green Street
North Beach · San Francisco, CA 94133
-
1962
Built as a commercial building to the design of Hertzka & Knowles, one of the modern architects the city's survey identifies as working in North Beach.
-
1962
Built for the Columbus Savings and Loan, to the design of Hertzka & Knowles.
-
Nov 1982
Additions alterations or repairs.
-
Aug 1983
Relocate entrance doors install new automatic teller machine.
-
Dec 1988
Erect sign.
-
Jun 1991
Erect sign.
-
Jun 1991
Erect sign.
-
Jun 1991
Erect sign.
-
Nov 1991
Reface sign b.
-
Nov 1991
Reface sign c.
-
Nov 1991
Reface sign e.
-
Nov 1991
Reface sign a.
-
Nov 1991
Reface sign b.
-
Aug 2000
Architectural ti for new tenant citibank.
-
Aug 2000
Sign permit - electric, wall, singlefaced.
-
Dec 2000
Add mechanical 4 total equip on rock using some e ductwk t.i. n exposed ductwork on roof 1st floor ceiling.
-
Jan 2001
Sign permit-electric, wall, singlefaced.
-
Aug 2011
To erect electrical single face wall signs (4).
-
Aug 2011
To erect electrical double faced projecting sign.
-
Aug 2012
Interior t.i existing bank. work includes upgrades to existing bathrooms relocation & addition of one atm machine (interior) no exterior work. mep & fire protection under seperate permits.
-
Jan 2022
To correct nov# 202055601. we are doing no work to the building i already have shared spaces and have been operating as a gallery/retail with approval of planning dept and city.
-
Jul 2022
Interior remodel with new partition walls and finishes. exterior work limited to a take out window + egress door lighting to remain. mep on seperate. building change of use from bank to grocery.
-
Sep 2022
Demolition of nonstructural interior partitions/finishes, no change to existing structure, electrical, mecahnical, plumbing.
-
Dec 2022
Replace 4 existing rooftop mechanical hvac units with in-kind.
-
Jan 2023
New storefront awning on green and stockton.
-
Nov 2023
Installation of trash enclosure on outside of the building on stockton street. no changes to interior of building.
DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31. 2 of them are nominal $1 street-space or sidewalk permits.
The city's survey gives 1962 for this building in two places and 1961 in a third. Not yet documented: the architect and builder and the early tenants. Submit an update