660 Lombard Street
North Beach · San Francisco, CA 94133
-
1953
Built as an institutional building for Telegraph Hill Neighborhood Center, to the design of John G. Kelley, one of the modern architects the city's survey identifies as working in North Beach.
-
Feb 1983
Additions alterations or repairs.
-
Jan 1984
Alterations to portions of first floor of existing building.
-
Sep 1987
Replace gyp bd ceiling, light fixtures, roof, siding, ramp.
-
Nov 1990
Install roof safty barrier, convert existing office into classrm.
-
Nov 1992
Cosmetic repair work 1 partit wal electrical wk new built up roof.
-
Aug 1993
Existing fence at lombard st. to be replaced with new fence.
-
Apr 1994
New fence with wire mash, concrete footing for the post.
-
Dec 1995
Fire alarm work.
-
Apr 1997
Install new fire alarm system.
-
Feb 1999
Demolition old play structure extend swing remodel sand.
-
Nov 2002
Retrofit existing system to accommodate the new youth center.
-
Aug 2006
Interior remodel for computer lab with associated disabled access upgrades.
-
Oct 2007
2nd floor - modify existing fire sprinkler system to properly protect the new tenant improvement area (replace 3 speakers, relocate 8 speakers, and add 3 speakers).
-
Feb 2011
Reroofing.
-
Sep 2013
Garden improvements at 2nd floor. remove existing ashpalt, gravel surfaces. install new permeable concrete, new moveable planters, new moveable and fixed benches. compliance with ordinance #155-13 not required.
-
Feb 2014
Interior alterations of existing community room, restrooms, breakroom and office space on 2/f. construct interior non-load bearing partitions, doors and finishes. modifications to existing mep. sprinklers & life safety to be covered under separate permit. n/a maher ordinance # 155-13.
-
Jul 2014
Day care improvements at 1st floor: accessibility upgrades, mechanical, electrical and sprinkler under separate permits; maher n/a.
-
Aug 2014
Add 4 new heads, relocate 2 heads, nfpa#13 t.i. permit application 201407111011. n/a ordinance #155-13.
-
Jun 2015
New hvac unit on roof, convert storage room to mechanical room, new forced air unit in mechanical room, new soffit. n/a maher ordinance.
-
Feb 2018
1) new interior wall with tempered glazing, 2) new entry door and new partiton at computer room, 3) new case opening at art room, 4) no mechanical and electrical wiring, 5) backboards and curtain mounts at gym. n/a for maher.
-
Mar 2021
Construction of new fence, trash enclosure, and entry gate at chestnut st. all fences and structure less than 10' above sidewalk.
-
Jun 2021
Repair of existing fence at northeast side of property with additional wood supports and footings. fence does not touch neighboring buildings. to comply with complaint 202178604.
-
Jun 2023
Install psl over e) windows. renove e) windows & replace with nana doors. install glass 3'-6 partition. replace e) drinkkin fountain to lavatories. replace e) doors to sinle 3' with 12" sidelight. remove e) double doors.
-
Aug 2024
At front remove existing windows and ins. psl; inst. new nana doors; replace existing window with new windows same kind and dimension.
DBI holds 32 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 32. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update