Permit history
-
Apr 1988
Seismic reinforcement, demolition as required.
-
Aug 1988
Alter & add interior partition @ 2nd & 3rd floor, new mezz.
-
Feb 1990
T/i to existing vacant space work new inter. partitions carpet.
-
Mar 1990
Cti.
-
Mar 2003
Add additional structural bracing to existing roof trusses.
-
Dec 2006
Demolition of current single level office/canopy. addition of new entry facade, access ramp & stair.
-
Apr 2007
Tenant improvement: partitions, lightiong, electrical. new stair and ada upgrades.
-
Apr 2009
Ground floor tenant improvement project: two first floor space are merged to create one full floor tenant space. work to i nclude enw walls, doors, interior glazing, millwork & finsihes. upgrade restrooms to full ada compliance. plumbing, electrical & fire sprinkler work to be permitted separately.
-
Mar 2010
New fire alarm installation and remove existing system.
-
Jul 2011
Demolition existing interior partitions build new demising wall, new partition walls, new suspended ceiling, new finishes. mep under seperate permit.
-
Dec 2012
Change of occupancy to b and f-1. interior ceiling height walls/new 1 hour rated walls as noted. nw electrical. for open area work space, shared office, conf. rooms, strorage room, & electrical room. new light fixtures as indicated throughout. the space. nw plmg fixtures & new ada shower & restroom. ch.
-
Dec 2012
Tenant improvement - demolition of existing space 3rd floor, new office and support facilities. sprinkler work under separate permit. mechanical & electrical work also included.
-
Apr 2013
Modification of existing electrical, plumbing & mechanical for installation of ph monitoring station. architectural work submitted under permit application 2013-0411-4353 (not issued).
-
Apr 2013
Grading parking lot to improve drainage & prevent water to go into building windows.
-
Jun 2014
2nd floor. existing office constructed for primary care clinic, imaging suite. upgrade mep sprinklers on a separate permit. fire alarm on separate permit. window wall glazing under separate permit. demolition application under permit application 2014/06/03/7372. ** maher: complaince with ordinance no# 155-13 not required **.
-
May 2015
Partial interior renovation, demolition non-load bearing partitions, ceiling & lighting elements & associated finishes. new construction consists of new non load bearing partitions, wheelchair lift, guardrails, bike racks, pantry, ceiling and lighting element and associated finishes. n/a ordinance #155-13.
-
Feb 2016
2nd floor demolition of interior non structural partitions, ceilings tiles. construction of non structural office partitions. sprinkler, fire alarm & mep on separate permit. maher na.
-
Feb 2016
1st floor demolition of non-structural partition walls, ceiling. installation of new on-structural office partitions. partial infill of 2nd floor openings - structural included, sprinkler, fire alarm & mep on separate permit. maher na.
-
Apr 2016
#200: modification and expansion of existing t.i. to include selective demolition and reinforcement non-load bearing partitions to create opening between 2 suite. minor electrical work to be removed back to source, relocation of light switches and relocation of exit sign new paint, carpet.
-
Apr 2016
Revision to ref pa's 201602028606/201602028608: mep permit - install new dx air-cooled split system and associated refrigerant piping and control. replace supplu air duct work and air devices. maher na.
-
Dec 2019
Ti include only demolition work per ab-017. the existing building ceiling is currently an open/exposed ceiling with all of the fire spriknkler heads already turned up facing open ceiling. a new ti permit will be sumitted under separate permit for the new construction. the building is fully sprinklered.
-
Mar 2020
1st fl ti includes demolition of non structural partitions and building new non structural partitions. meps life safety.
-
Sep 2020
3/f: t.i.: demolition non-load bearing partitions & doors. new interior partition & doors. new millwork and new beverage equip in break area. new all finishes. no changes to mechanical. minor replace of light fixt. electrical trade by gc. gc to provide supply lines for beverage equip.
-
Jul 2021
G/f: t.i.: demolition of non-structural partitions and building new non-structural partitions. all new or revised mep, ls etc will be design build and sbumitted if needed.