37.8064, −122.4141 A locator map appears here once a Mapbox token is configured.
Know This Place

District 3 · Block 0030, Lot 001 · ZIP 94133

425 North Point Street

Hotel

  • 4 stories
  • 135,000 ft2
  • 25,800 ft2 lot area
  • 221 rooms
  • Zoned C2
  • Not a historic resource
  • Sold June 12, 2015
37.8064, −122.4141 Street View appears here once a Google Maps embed key is configured.
  1. Dec 1987
    Permit 8718162S $$$ $5,700,000

    Four story 199 room hotel **superseded by 8813740s.

  2. Sep 1988
    Permit 8813740S $$$ $150,000

    Revisions to #8718162s.

  3. Sep 1989
    Permit 8916548 $$$ $177,000

    Install fire sprinklers.

  4. Dec 1989
    Permit 8923736 $$$ $600,000

    T/i incl partitions, walls, finishes, lighting mechanical hvac.

  5. 1990

    Built.

  6. Jan 1995
    Permit 9501110 $$$ $20,000

    Convert auxilliary loading space to dining space for cafe.

  7. Dec 2006
    Issued Permit 200612149849 $$$ $25,000

    Kms-new fire service and reroute basment main.

  8. Nov 2010
    Issued Permit 201011054427 $$$ $5,200

    Add 2 new smoke detector and 3 relays to an existing fire alrm system for an elevator modernization.

  9. Nov 2010
    Issued Permit 201011185268 $$$ $35,000

    Remove barriers for ada -install door operators -install new shower stall in ada rooms -repair counter to meet ada standards.

  10. Dec 2011
    Permit 201112291436 $$$ $80,000

    Demolition of e lobby storage closet to creat extended open space at lobby for concierge services or lobby library. also involves accesssibility upgrade to 1st fl reception area, 1st fl public restrooms and handrails at 2 sets of stairs off e lobby.

  11. Apr 2014
    Issued Permit 201404163370 $$$ $7,480

    1st floor - add to an existing fire alarm system new fire alarm devices in existing restaurant. this is an voluntary improvement include 5 horn/strobes, 2 strobes, 1 bps, 1 smoke detector & 1 pull station.

  12. Dec 2015
    Issued Permit 201512114894 $$$ $13,000

    Scope includes interior renovation of 2 existing non ada compliant guestrooms and guest bathrooms(two rooms) work includes removal & replacement of existing plmg fixtures and finishes in guest bathroom and guestroom. change to occupancy or egress. mep under seperate permit. n/a for maher.

  13. Feb 2016
    Permit 201602038705 $$$ $8,000

    1st floor: facu replacement.

  14. Sep 2016
    Permit 201609016556 $$$ $810,700

    Ground floor lobby arch/mep: interior non structural renovation of lobby, meeting rooms and public spaces. merge one office space and one meeting room to larger meeting room. new ramp and stair to courtyard, reno of courtyard finishes, and replacement of storefronts at lobby & courtyard. n/a maher.

  15. Sep 2016
    Permit 201609278877 $$$ $2,700,000

    Renovation of existing guestrooms, scope of work limited to: lighting placement, plumbing fixture replacement, finishes and reconfiguration of accessible guestrooms, mechanical. electrical. & plumbing under seperate permit. n/a ordinance #155-13.

  16. Sep 2016
    Permit 201609299183 $$$ $1,325,000

    Renovation of existing guestrooms - scope limited to lighting replacement and plumbing fixture replacement. ref #201609278877. n/a maher ordinance.

  17. Sep 2016
    Permit 201609299178 $$$ $12,932

    New bar area in existing concierge room. scope of work limited to new casework, lighting, plumbing, finishes and kitchen equipment (restaurant area). maher not req.

  18. Oct 2016
    Permit 201610039419 $$$ $155,000

    Renovation of port cochere area scope of work limited to: resurface floor, new suspended ceiling and lighting replacement. n/a maher.

  19. Oct 2016
    Permit 201610039415 $$$ $40,000

    Revision to 2016-0901-4556 to add sculpture in courtyard.

  20. Feb 2017
    Permit 201702038627 $$$ $70,000

    Revision to 2016-0929-9183 to include changes to corridor lighting controls and emergency lighting maher not req.

  21. Mar 2017
    Permit 201703060682 $$$ $220,000

    Fire alarm ti add 80 smoke det, 8 manual pull stations, 24 control modules, 6 monitor modules, 4 dual monitor modules, 33 strobes, 212 horns, 38 horn/strobes, 6 power supplies to existing fire alrm system. ref app #2016-0927-8877.

  22. Mar 2017
    Permit 201703060683 $$$ $24,200

    Fire alarm ti add 12 smoke detectors, 6 duct detectors, 9 relay modules, 5 strobes, 9 horn strobes to existing fa system. ref permit application 2016-0901-6556 & #2017-0223-9933.

  23. Apr 2017
    Permit 201704063328 $$$ $7,242

    1-4 floors: fire sprinkler t.i. under general contractor 201609278877. relocate 13, add 1 total 14x(517.32)= 7, 242. n/a for maher.

  24. Aug 2017
    Permit 201708013552 $$$ $5,000

    1st fl: as built for 2 demoed sidewall fire sprinkler heads and adding 2 f/s heads in new socket per app 2017-0324-2332 and arch app #201609016556. n/a for maher. requested by field inspector.

DBI holds 65 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 65. 13 of them are nominal $1 street-space or sidewalk permits. 1 expired permit is not shown.

Nearby