1998 Broadway
Pacific Heights · San Francisco, CA 94123
Permit history
-
Aug 1992
Seismic strengthening affecting less than 30% of lateral frc.
-
Apr 1996
Reroofing.
-
Apr 1998
Fire alarm system upgrade - all floors including garage.
-
Aug 2001
Street space permit.
-
Feb 2002
Street space.
-
Feb 2010
Renovate existing hallways on 12 floors. replace existing carpet, lighting & exit sigfns. paint, patch & repair existing drywall, nre drywall under existing concrete slab ceiling to cover existing accoustical ceiling, add recessed light fixtures to ceiling.
-
May 2013
Remodel kitchen and baths, add washer and dryer, add soffits, and sliding doors at dinning.
-
Mar 2015
One unit: remodel kitchen & baths. add washer & dryer.
-
Nov 2015
Interior remodel of 1 unit in a multi unit building.
-
Jul 2017
One unit: interior remodel: r/r kitchen cabinets, counter tops & appliances. r/r tile in 2 bathrooms with 2 vanities, counter tops & plumbing fixtures. no structural changes; plumbing & electrical udner sep permits.
-
May 2018
No walls moved, removed or added. all existing layouts to remain unchanged. remove & replace tile in 2 bathrooms with 2 vanities, countertops & plumbing fixtures. no structural changes, all fixtures to remain in current location.
-
Mar 2019
Kitchen: like for like. new cabinets, sink, floor, tile; 187 sq ft. master bathroom: new floor, new sink, toilet, shower; 100 sq ft. guest bathroom: new floor, sink, toilet, tub, tile; 50 sq ft.
-
Aug 2019
One unit: kitchen remodel all fixtures to remain in place. 2 bathroom remodels, new tile, new vanity, new shower pan. kitchen 10x10 / bath 6x10 / bath 8x10.
-
Nov 2020
Installation of electrical vehicle charging equipment and related infrasturcture.
-
Aug 2021
One kitchen and two bath remodel: remove and replace kitchen cabinets, countertops and appliances. remove and replace tile in 2 bathrooms with 2 vanities, countertop and plumbing fixtures. no structural changes. plumbing and electrical under separate permit. must comply with sffc 1103.7.6.1.
-
Aug 2021
Provide automatic fire sprinkler protection for garage levels 2 & 3. correct fire sprinkler spaceing issues on garage level 1.
-
Sep 2021
One unit: interior remodeling of kitchen, 2 bathrooms, 2 bedrooms and living area.
-
Dec 2021
#1501: interior renovation of existing bedroom, existing kitchen, and existing 2 bathrooms.
-
Aug 2022
Interior remodel, demolition existing kitchen cabinets, primary bathroom vanity & closet. new kitchen cabinets primary vanity & walk-in closet. including plumbing & electrical work. no structural work. no work on building perimeter.
-
May 2023
Removal of existing waterproofing membrane, overburden & plants @ g3 garage level roof, installation of new drains, waterpoofing membrane, overburden and landscaping @ g3 garage level roof, repair of existing concrete cracks & spalls @ g3 garage level ceiling.
-
Jul 2023
One unit: remodel kitchen in-kind, replace cabinets, counters, plumbing & light fixtures; remodel (2) bathrooms in-kind: replace vanities, tile, plumbing & light fixtures, install new hardwood flooring throughout. no structural changes.
-
Apr 2024
Scope of work 2 bathrooms and (1) kitchen being remodeled-all new plumbing & electrical fixtures, new tile on walls & floor, new shower pans, new kitchen cabinets & appliances, new countertops & plumbing fixtures. new electrical panel upgrade, new washer & dryer in master bathroom.
-
Oct 2024
One unit: all work in kind. remodel (2) bathrooms, (1) laundry rm with with d, (1) kitchen with new vanity cabinets, kitchen cabinets and stone. all new plumbing fixtures will comply with current gpm flows. also, new low voltage track lighting in ceiling. existing ceilings to remain. no structural work.
-
Mar 2025
Interior alteration to a single existing condominium unit on the 12th fl. of a 15- story residential building. all work interior, non structural. no change in use or occupancy. no increase in floor area. no exterior alterations. remodel existing kitchen counter, cabinets and appliances.
DBI holds 121 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 121. 21 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early residents. Submit an update