2222 Broadway
School building
-
1904
Built.
-
1912
Bliss & Faville designed the James Flood Mansion.
-
November 22, 1913
C. C. Morehouse contracted for the metal lathing and plastering of James L. Flood's residence, then going up, at $8,800.
-
November 29, 1913
The California Artistic Metal and Wire Company contracted for the residence's iron stairs, balconies, railings and window grilles and the bronze work of 25 windows, at $4,481, and the Budgear-Merle Company for its bronze vestibule door and frame, at $13,000.
-
Mar 1992
Voluntary seismic upgrade remove structure.
-
Mar 1993
Erect a two story school gymnasium.
-
Oct 2000
To erect classrooms/assembly.
-
Mar 2001
Install transformer vault into the sidwalk adjacent to the building.
-
Oct 2003
Installation of new fire alarm system.
-
Feb 2012
Interior remodel to existing kitchen, work to includes new kitchen equipment, new servery equipment, food storage & offices on the lower level. mechanical, type-i & type-ii hoods under separate permit.new exterior loovers at lower level.
-
Apr 2014
Barrier removal and elevator modernization. architectural only. fire sprinklers life safety system, existing elevator and equipment modernization engineering under separate permits by design build contractors.
-
Jun 2014
Modification to existing class room including new flooring, lighting and radiant heater.
-
May 2015
Barrier removal, install new handrail & guardrail at existing stair.
-
Jun 2015
2nd floor: remodel class rooms #108, 109 & 110 and break out space (study area), provide 2 new offices #112 and 113 in open space area #111, new ceiling, mill work, flooring lighting.
-
Jul 2015
Classroom upgrades including new light fixtures, lighting control and receptacles, mnor hvac equipment connections ref 201506249820 er exit signs and lighting.
-
Apr 2016
Demolition of non-bearing interior walls & finishes, new wall & door for new president's office. mep to be separate design build permit. no change of use or occupancy. no exterior work. fire alarm under separate permit.
-
Jul 2016
Ti - classroom: replace carpet, lighting, ceiling - furred out walls. paint space. electrical work throughout.
-
May 2017
Interior renovation of existing science classrooms to a private k-12 school. mep to separate design build pemrit. no change in use or occupancy. fire larm and sprinklers to be separate permit.
-
Aug 2017
Mechanical plan & title 24, electrical plan & title 24. ref permit application 201705237325.
-
Aug 2017
2nd and 3rd floor restrooms - mechanical and electrical plans and t-24. ref. app#2017-05-24-7475.
-
Oct 2019
Interior renovation of existing assembly space in a private k-12 girls school. no change in use or occupancy. mep & fire alarm under separate permit.
-
Feb 2021
New lighting & power signal for existing assembly space, new panel board, new theatrical lighting control system. title 24. ref permit application 201910013159.
-
Feb 2021
Tenant improvement mechanical work. revise existing duckwork & hydronic piping as necessary to accomodate new work. furnish & install new air terminals, vrf systems, fan & piping/ductwork as necessary. air balance & title 24. ref permit application 201910013159.
-
Mar 2024
Remodel toilet rooms at main level. mep, t-24 energy calcs, life safety under separate permit.
-
May 2024
Restroom exhaust installation. ref permit 202403188062.
-
Jul 2026
Steam boiler replacement with new of same capacity. no architectural or building structural work. no change in gas. new concrete pad. ref serial #57439.
DBI holds 111 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 111. 4 of them are nominal $1 street-space or sidewalk permits. 3 expired or cancelled permits are not shown.
Nearby
- 2201 Broadway Same street
- 2307 Broadway Same street
- 2300 Pacific Avenue Around the corner
- 2360 Pacific Avenue Around the corner
- 2550 Webster Street Around the corner