37.7943, −122.4372 A locator map appears here once a Mapbox token is configured.
Know This Place

District 2 · Block 0562, Lot 005 · ZIP 94123

2430 Broadway

Single-family house · Pacific Heights

  • 3 stories
  • 5,825 ft2
  • 5,497 ft2 lot area
  • 17 rooms
  • 5 bedrooms
  • 4 bathrooms
  • Wood frame
  • Zoned RH-1
  • Historic resource
  • Sold October 19, 2023
Land$4,554,036
Improvements$2,641,684
Total assessed$7,195,720
37.7943, −122.4372 Street View appears here once a Google Maps embed key is configured.
  1. 1903

    Built.

  2. June 16, 1928

    A permit was sought for alterations: building additional sun rooms and a new roof, enlarging bedrooms and remodelling a bathroom in a dwelling, estimated at $5,000. H. G. Stoner was named as architect and E. T. Adams as contractor.

    Building and Engineering News, San Francisco Public Library (Internet Archive)
  3. June 30, 1928

    A building contract was recorded for alterations and additions to a residence. Harold G. Stoner was named as architect and Ernest T. Adams as contractor.

    Building and Engineering News, San Francisco Public Library (Internet Archive)
  4. Sep 1994
    Permit 9415821 $$$ $4,600

    Minor dry rot repair to base of house on street side.

  5. Oct 1994
    Permit 9417810 $$$ $2,000

    Repair existing wall below exterior grade at front wall.

  6. Mar 2000
    Permit 200003144319 $$$ $120,000

    Remodel kitchen, some windows at existing locations, lv room & dining.

  7. Apr 2000
    Permit 200004056445 $$$ $5,000

    Revise permit application 2000-03-14-4319-submit structural calculations & plans for widen door openings.

  8. May 19, 2005

    A three-story, single-family dwelling stood at the property.

    San Francisco City Planning Commission minutes, San Francisco Public Library (Internet Archive)
  9. June 2, 2005

    The City Planning Commission did not take discretionary review and approved the project at 2430 Broadway.

    San Francisco City Planning Commission minutes, San Francisco Public Library (Internet Archive)
  10. Oct 2009

    To obtain final inspection for work approved under permit application 200702154290. all work is complete.

  11. Oct 2009

    To obtain final inspection for work approved under permit application 200506074464. all work is complete.

  12. Oct 2009

    To obtain final inspection for work approved under permit application 200504150133. work is complete.

  13. Mar 2010
    Permit 201003178363 $$$ $50,000

    Minor alterations to master bathroom: remove/replace existing cabinets and plumbing fixtures with new. kitchen: remove and replace cabinets and fixtures with new. no changes to building envelope of structure. no new lighting. no walls relocation. no structural work.

  14. Apr 2013

    To obtain final inspection for work approved under permit application 201005202872. all work is complete.

  15. Jun 2013
    Permit 201306189821 $$$ $16,000

    Remodel master bathroom and master closet add washer dryer; interior work only, demolish 2nd bathroom @ master bedrm @ closet.

  16. Sep 2013
    Permit 201309267787 $$$ $6,000

    Install four sprinkler heads at 3rd floor to use existing meter.

  17. Oct 2013
    Permit 201310189690 $$$ $22,000

    Add elevator to run from garage basement level to floor '3'. alter existing fire escape per pre-application meeting. fire sprinkler under separate permit.

  18. Jul 2014
    Permit 201407151303 $$$ $55,000

    Infill existing portion of deck between living room & kitchen @ 2nd floor. extend deck above over infill & fireplace (gas) @ living room. ** maher: compliance with ordinance no# 155-13 not required **.

DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 13 of them are nominal $1 street-space or sidewalk permits. 11 expired or cancelled permits are not shown.