2526 Broadway
Condominium unit in 2520–2530 Broadway
-
Mar 1987
Remove mouldings, plaster(interior only), etc.
-
Mar 1987
Basic remodeling of interiors kitchen, bedrooms, bathrooms.
-
May 1987
Second means of exit. raise skyline & window 2nd level.
-
Feb 2015
Replace 18 wood windows. 8 wood windows on primary facade will be replaced in kind, wood for wood, with ogee lugs, same dimensions and profiles. 10 windows on non-visible facades to be replaced with aluminum-clad windows, same dimensions and profiles, with ogee lugs.
-
Aug 2019
Renovation of condo unti withing a 6 unit building. condo is on 3rd & 4th fl of 4-story building. no work on 1st & 2nd fl. scope includes selective demolition & partial renovation of condo unit. new kitchen & bathroom fixtures. replacement of rear window on 4th fl. total of 5 proposed skylights.
-
Aug 2019
Rev to permit application 201908017616; removal of existing stair between 3rd & 4th fl.
-
Dec 2019
Revision to permit application 201908209358 and 201908017616. work to include (5) new skylights at 407 dining room and (1) new skylight at 403 bath. structural revisions to skylight layout included in scope. electrical change on rcp include additional lights fixtures, switches and receptacles.
-
Jan 2020
Reocnfigure 4th fl fire sprinkler system to suite residential remodel. relocate 15 existing sprinklers, add 11 new sprinklers. no work to 3rd fl. utilize existing 4" dedicated underground: install new 4" backflow prevention.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.