2920 Broadway
Pacific Heights · San Francisco, CA 94123
-
1931
Built.
-
Aug 1996
Install concrete steps and landing in center courtyard.
-
Apr 2005
Remodel 5 1/2 bathroom: add new bath 2nd fl, remoe spiral staircase in full opening to match existing/.
-
Nov 2014
Interior ti renovate fixtures, appliances, 6 bathrooms, 2 powder rooms, infill and removal of lower level addition. convert lower level rooms to storage. upgrade light fixtures and finishes throughout. no structural work.
-
Feb 2015
Revision to approved permit application 201411212281, all work on lower level, scope is to combine 2 existing bathrooms into one, remove sauna & combine existing study and laundry into one room.
-
May 2015
Adding & replacing proposed security gates & window protection on the broadway site ground level.
-
Dec 2019
Remodel of an existing home. massing, profile, & essential form of the building remain unchanged. exterior street facing facade will be repaied & restored, design unchanged. fenestration changes proposed on secondary facades, rear extension from 1959 to be removed and replaced with new extension.
-
May 2022
Revision to permit application 201912230360 s1 to incorporate shoring design changes.
-
May 2022
Revision to permit application 201912230360 s2 to include foundation and structural revisions.
-
Jun 2022
Revision to pa 2019-1223-0360 s3 to incorporate arch/mep revisions; added 8 hours to cover back check hours for this permit application as well as for back check hours to cover time for structural and shoring revisions that was not previously charged, dmj 10/24/2022.
-
Dec 2022
Revision to permit application 2019-1223-0360 & 2022-0503-3490 for revised rear yard design.
-
Mar 2023
Revision to permit 201912230360-s1. to incorporate landsacpe shoring design changes.
-
May 2023
89kwh lead acid battery ess installation.
-
May 2023
Revision 201912230360. addendum 3 include revision to level 3 and level 4 plan layouts and rcp layouts.
-
Jan 2024
Residential fire sprinkler system, 205 sprinklers, 22ft of 4" underground.
-
Mar 2024
Revision to #201912230360-s3, 202206075750 & 202305177950- revision mechanical systems and reduction of veritcal ducts runs, removal of utlitly shaft, lofting ceiling of bedroom 303 and non structural layout changes.
-
Jun 2024
Revision to bpa# 2024-0314-7863, 2022-0607-5750, and 2019-1223-0360-s3: revision to mechanical system at level to include to level 0 to incllude exhaust system for future battery room.
-
Sep 2024
Rev to permits 201912230360-s2 and 202205033490 in response to comments on add. 2 rev 3 submission dated 03/01/2024 add. 2 revision 3 included kid's bedroom vaulted ceiling, revised structure for study ceil., replacement of ridge bm between gl.6&7 modify structure at level 2-5 per field cond.
-
Feb 2025
The scope of this project is to install a new fire alarm system into an existing home that is being renovated and retrofited with a fire sprinkler system, in addition to the code required sprinkler monitoring, the system includes the voluntary addition of smoke detection throuout the common areas per.
-
Jan 2026
Recommencement and completion of work approved under permit application 202305167902.
-
Jun 2026
To obtain final inspection for work approved under permit application 202206075750, 202212239072, 202303163795. all work is complete.
-
Jun 2026
To obtain final inspection for work approved under permit application 202305177950, 202403117574, 202403147863. all work is complete.
-
Jun 2026
To obtain final inspection for work approved under permit application 202406275409. all work is complete.
-
Jun 2026
To obtain final inspection for work approved under permit application 201912230360, 202205033486, 202205033490. all work is complete.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Nearby
- 2898 Broadway Same street
- 2950 Broadway Same street
- 2901 Vallejo Street Same block
- 2970 Broadway Same block
- 3052 Pacific Avenue Around the corner
- 2950 Pacific Avenue Around the corner
- 3020 Pacific Avenue Around the corner