2155 Buchanan Street, Unit 1
Condominium unit
-
Mar 1993
Replace sheet rock & cabinetry in kitchen/no structural work.
-
Apr 1994
Reroofing.
-
Aug 1997
Demolition existing plaster, new tub/inlet & sink.
-
Aug 2001
Replace fixtures (rath, toilet, sink) replace wall/floor tile.
-
Aug 2010
Repair exterior stairs @ rear less than 50%.
-
Feb 2013
Foudnation addition and wood beam repair in crawl space.
-
Aug 2013
#1- interior remodeling on ground floor: remodel kitchen & enlarge bathroom.
-
Sep 2015
Soft story retrofit. addition of wood shear walls and steel moment frames at lower level garage. maher na.
-
Mar 2017
Revision to 201509086308: seismic retrofit of soft story to comply with sfbc 4d mandatory seismic retrofiet iebc a4 maher not req.
-
Jul 2017
Repair/replace <50% of rear stairs in kind.
-
Apr 2018
Streetspace.
-
Oct 2023
1 kitchen remodel like for like.
-
Apr 2024
Upgrade existing fire alarm system in non sprinklered building to comply with 2022 cbc/cfc, nfpa 72 and sffc sec 1103.7.6.1. install new facu with new radio to monitor system. smokes in common areas and pulls each level and exit; horn/strobes in common areas and install low frequency sounders inside.
6 nominal $1 street-space or sidewalk permits are omitted from the timeline. 3 expired or cancelled permits are not shown.