2101–2117 Fillmore Street
Pacific Heights · San Francisco, CA 94115
-
1911
A mixed-use commercial building of 1911.
-
Nov 1986
Repair damage of trash & install sprinkler heads.
-
Dec 1986
Installation of trash chute and fire sprinkler.
-
Feb 1992
Interior demolition/ partitions/plumbing/electrical/acoustic ceiling.
-
Aug 1995
Earthquake hazard mitigation.
-
Jun 1996
Reroofing.
-
Apr 2001
Removal of non-structural elements. construct walls & doors, new finishes & casework. ground fl only.
-
Nov 2006
Demolition existing t-bar ceiling and non bearing partition. replace with metal support grid and drywall, install new track lighting, flooring and paint sales area.
-
Jan 2013
New windows at south elevation of building at ground level. visible from the street.
-
Apr 2014
Replace access hatch and sidewalk slab repair at dinos pizza. adj fillmore/ ca corner.
-
Dec 2014
Demolition existing non conforming toilet room and relocation of existing plumbing, waste, and vent lines to new location. new accessible single occupancy toilet room.
-
Feb 2015
Interior professional service t.i. including new furniture, fixtures & finishes, such as paint and decorative trim. new food service and transaction counter/ada compliant. new liquid nitrogen tank and required venting and emergency shut off. n/a for the maher.
-
Aug 2016
Retail ti to existing retail space 599 sq ft. new lighting interior. remove exterior facade awning. no plumbing. sign under separate permit.
-
Oct 2016
Revision to 201608316504 to comply with ti 20% on ada. n/a ordinance #155-13.
-
Jun 2018
Remove & replace existing bar. install new tile flooring. remove and replace kitchen & equipment with new. install stainless steel backsplash. paint interior and exterior. kitchen hood and duct suppression system under separate application.
-
Aug 2018
Mechanical for pa 2018-0620-2378.
-
Oct 2021
T.i. of an existing retail space for new retail use. new finishes, lighting, minor electrical work.
-
Nov 2021
Ground floor, beauty shop: new wall and floor finish, new furniture. electrical for new fixtures. walls ceiling lighting to remain existing, restrooms existing. basement no work.
-
Apr 2022
Renovation to existing retail space: lighting, cabinetry finishes & partition work. electrical - new lighting, power & minor new plumbing added. low voltage systems. hvac will be split systems with air handlers & condension units. new storefront system. mino demolition. no change to occupancy. no structural work.
-
Aug 2022
Interior food svc...tenant improvements including new finishes such as paint, tile & new countertops, remove and replace awning...new signage...new eq...existing machanical /hvac to remain fire supression system under a seperate permit.
-
Sep 2022
Installation of ansul r102 ul 300 kitchen hood fire suppresson system.
-
Oct 2022
Install security gate 63" x 99".
-
Nov 2022
T.i. new furniture, paint, replace (1) broken glass lite in-kind, upgrade electrical if needed. pre-prepare food only. no food or drink prep.
-
Feb 2023
Upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 to meet 75d in all sleeping areas.
-
Aug 2023
T.i. change of use from reetail to cafe, the project consists of an interior renovation to existing retail space including lighting, cabinety, partitions, plumbing, electrical, mechanical, flooring. a new stair, storefront, and ada compliant bathroom and fixtures are also proposed.
-
Nov 2025
Provide and install new heat pump and fan coil. includes ventallation air.
DBI holds 47 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 47. 8 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Submit an update