July 5, 1951
The Office of the Assessor-Recorder photographed the property for tax assessment.
-
Dec 1982
Additions alterations or repairs.
-
May 2002
Replace 1 stringer with 2x12 pt. fir, replace 2 2x6 rw treaas.
-
Jul 2002
Remove & replace dry rot on exterior stair case at rear of house less than 50%.
-
Apr 2003
Street space & sidewalk repair.
-
Sep 2012
Replace foundation. new grade beams, footings, slab on grade.
-
Nov 2012
Comply with nov 201339291. remodel interior space. dwelling unit merger to create a single family residence from existing 2 unit flats. new roof deck set back from front & rear facades. new elevator & stair penthouse on the roof.compliance with maher ordinance no. 155-13 not required.
-
Feb 2014
Temporary grading @ rear & cribbing.
-
Feb 2014
Foundation revision to permit application 2012.09.21.0374 - new 24" mat slab. compliance with ordinance #155-13 not required.
-
Mar 2014
Site stabilization, concrete walls @ rears. need to comply ordinance #155-13.
-
Nov 2014
Ref to permit application 2012/11/19/4485. revised demolition plans. new exterior egress stair in rear. horizontal addition to 2nd & 3rd stories in rear. envelope to extend to property lines. alteration to front facade. upgrade to fully sprinklered per nfpa 13r. ** maher: no# 155-13 requied; route to dph **.
-
Mar 2015
Temporary shoring of foundation of existing rear yard. n/a maher ordinance.
-
May 2015
Installation of new fire sprinkler system per nfpa 13 through-out 3 story building. installation of new 2" fire line underground with 2 1/2 back flow preventer off of 6-inch main on green st. ref app#201211194485. n/a for the maher.
-
Jun 2015
Install temp waler five ft above mat slab to restrain drilled pier. after installation of waler, cut all rebar crossing rear property line under 100% supervision of the eor. compliance with maher ordinance no 155-13 not required.
-
Jun 2015
To comply with nov: 201521571: new retaining wall at rear yard. see permit application 2015 0601 7718. maher n/a.
-
Jan 2016
To comply with nov #201584831, wine cellar to expand 5'6" in width (e-u), new 6" concrete wall to conform to wine cellar length (n-z) per approved bpa #201411040648. ** maher: n/a **.
-
Jun 2016
Response to nov #201584831. revision to app#201601116772. alterations to wine cellar: mat slab, property line retaining walls and new opening for door in concrete wall at line a/3-4. structural work only. n/a for maher.
-
Aug 2016
Add 5 sprinklers in wine room. ref 20141100648 maher na.
-
Aug 2017
To obtain final inspection for work approved under permit application 201211194485. all work is complete.
-
Aug 2019
Install 6 new hss columns to support existing w16x77 in front of existing concrete wall.