2518 Jackson Street
Single-family house · Pacific Heights
-
1898
Designed by architect David Salfield.
-
1900
Built.
-
November 9, 1978
Drew College Preparatory School, with John F. Kennedy University's museum-studies programme, had taken over the Lincoln University site; the Commission voted 6-0 to hold a conditional use hearing to set conditions on the school.
-
September 13, 1979
The City Planning Commission voted 4-3 to set conditions on the Drew School's automatic conditional use of the property, limiting its classes to 8 a.m.-4 p.m. on weekdays and ending the John F. Kennedy University Center for Museum Studies' tenancy there by 30 June 1983, its evening classes held to 5-10 p.m. (Resolution 8372).
-
Oct 1986
Remodel bathrooms.
-
Oct 1986
Gutters & reroofing.
-
Nov 1986
Horizontal extension, construct decks.
-
Feb 1987
Pulling in garage in basement of building excavation in fron.
-
May 1988
Exploratory demolition of plaster & drywall in 2/f.
-
Sep 1988
Reroofing.
-
Sep 1988
Install new glass skylights, reframe roof, re #8810400.
-
Sep 1988
Emergency fire repair of roof rafters & sheathing.
-
Oct 1990
Continue work started under expired app #8815878.
-
Oct 1990
Continue work started under expired app #8810400.
-
Sep 2021
Reroofing.
-
Aug 2022
Interior remodel in existing building, new fixtures, finishes, minor reconfiguration of floor plan with same structural. foundation infill, replace windows in kind. no expansion of envelope. no work in public right of way.
-
Dec 2022
Stabalize existing brick retaining wall in rear yar with new shotcrete and grade beams.
-
Jul 2023
Reduction in footprint of e dormer with associated structural work. no work in public right of way. scope of work structural work from previously apprvd drawings 202208261397 202212077786 no changes to fixture count.
-
May 2024
Install a 14.4 kw pv system with a 30 kwh franklin bess.
-
Jun 2024
Replace fence in kind. repair front stair nosing in kind. all work in front of the building no other work to be performed for this application. fence not exceed 6' height, front must be 75% transparent.
-
Aug 2025
Revision to solar permit application 202404119821, adding an additional 30kwh's of storage. total storage is 60kwh's reducing space between batteries to 12 inches. need fire variance.
DBI holds 29 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 29. 3 of them are nominal $1 street-space or sidewalk permits. 7 expired permits are not shown.
Nearby
- 2510 Jackson Street Same street
- 2570 Jackson Street Same street
- 2504 Jackson Street Same block
- 2513 Pacific Avenue Same block
- 2517 Pacific Avenue Same block
- 2519 Pacific Avenue Same block
- 2518 Pacific Avenue Around the corner
- 2510 Pacific Avenue Around the corner