2230 Pacific Avenue, Unit 101
Condominium unit
-
Aug 1990
Kitchen remodeling.
-
Jul 1993
Change tub, shower walls, sink, kichen counntertops & applns.
-
Jan 1995
Termite work.
-
Jan 1996
Remove dryroted header. remove stucco/trim on windows. etc.
-
Feb 2000
Remove and install new ceramic title floor in lobby, linoleum in laundry room.
-
Mar 2017
Soft story seismic retrofit in accordance with mandatory city of sq ft ord - tier iii. soft story retrofit per sfebc chapter 4d engineering criteria: other rational design.
-
Mar 2017
Reroofing.
-
Jun 2018
One unit: kitchen remodel, use existing floor plan, appliancesm fixtures in same location, water damage & dry rot repair in adjacent livingroom floor & walls, 140 sq ft. max, maintain all (2) accessible heights & clearances.
-
Jul 2019
Repair in kind parking garage door, door framing and exterior stucco. repair damage caused by motor vehicle.
-
Nov 2021
Recommencement and completion of work approved under permit application 201806152058.
-
Aug 2024
Upgrade existing fire alarm system to comply with sffc 1103.7.6.1 all units.
-
Oct 2025
One unit: bathroom face lift in kind, shower, tub, vanity, and toilet. plumbing stays the same and no wall changes. replace tile, new paint, and change light.