3090 Pacific Avenue
Pacific Heights · San Francisco, CA 94115
-
between 1947 and 1951
The Office of the Assessor-Recorder photographed the property for tax assessment.
-
Feb 1984
Remove stucco from front garage walls, balcony & stair.
-
Oct 1996
Remove stucco from front of house/west side, dry rot repair.
-
Dec 1997
Renew appln #9620273.
-
Jul 1998
Horizontal addition.
-
Nov 1999
Relocate fire pole ladder & add balcony revision to9814284.
-
Aug 2005
To weatherproof deck at 2nd level repair water damage at garage ceiling.
-
Dec 2006
Reroofing.
-
Aug 2015
Renovation and remodel including new powder room & laundry at basement and remodel 1st fl including kitchen, living, family & dining rooms. new window at front stair to match e, new sliding door units at rear new deck at 34" high above grade at rear. compliance with maher ord #155-13 not required.
-
Sep 2015
Add: revision to permit application 201508184598: add remodel to 3rd floor - bedrooms & bathrooms; remodel to 4th floor - bedroom, bath & pentroom including rework of 2 (3) rear dormers. mass reduction - maher na.
-
May 2016
13r fire suppression system throughout entire dwelling including dedicated 4" underground per nfpa 24. compliance with maher ordinance no 155-13 not required.
-
Sep 2016
Remove/replace in-kind stucco at south elevation, partial west elevation & dormers due to discovered dry rot, visible from street. replicating details as documented in photos and diagrams.
-
Dec 2017
Repalce kitchen faucets, all can light trim. remove cabinetry at living room, construct new fireplace surround. install new stone floors, in entry. refinish hardwood flooring. no exterior work.
-
Feb 2020
Reroofing.
-
Aug 2020
Energy storage system: 20 kw (ac battery inverter rating); 54 kwh usable energy (56 kwh total energy); (1) tesla gateway (ref permit application e201906131979 with roof pv system); (4) tesla powerwall-2 batteries; (installed on rear wall, under exterior deck); heat detector/fire alarm under separate permit.
-
Apr 2024
Upgrade fire alarm to comply with fire marshal to add monitoring for sprinkler and ess heat detectors. ref 202008141807 ess/201605187701 sprinklers.
-
Oct 2024
Exterior stucco repair due to dry rot & water damage included repair/ replace of exterior windows in kind. replace rear yard doors. addition of new front gate at st facade.
-
Apr 2025
Revision to previous approved permit 202410022162. repair/reframe exterior front deck due to dry rot, repair damaged concrete driveway, replace exterior guardrail in kind due to dry rot. replacing rear guardrail with new.
-
Feb 2026
Recommencement and completion of work approved under permit application 202410022162.
-
Apr 2026
Exterior stucco to be replaced in kind due to water intrusion at east facade (facing private driveway).
-
Apr 2026
Recommencement and completion of work approved under permit application 202504023544.
4 nominal $1 street-space or sidewalk permits are omitted from the timeline.