2032–2064 Polk Street
Pacific Heights · San Francisco, CA 94109
-
1907
Built in 1907, its storefronts flanked by plain stuccoed piers.
-
Dec 1981
Additions alterations or repairs.
-
Mar 1983
Erect sign.
-
Apr 1986
Canvas covered awning over store space.
-
Mar 1990
Repair fire damage on third floor.
-
Sep 1993
Reroofing.
-
Jan 2002
Replace sheetrock using 5/8 fire retardant sheetrock work to be done in shower room where sheetrock.
-
Aug 2002
Open walls to upgrade electrical wiring, patch & paint, install new lighting fixtures.
-
Jan 2003
Install the fire sprinkler systems for the residental hotel only per sro hotel ordinance#170-02.
-
Jan 2004
Remodelings shower rooms on second & third rooms & adding shower stall in each shower room. comply w.
-
Dec 2005
Install dialer to existing fire alarm panel for sprinkler monitoring.
-
May 2006
Change sheetrock in an (e0 kitchen on 1st floor.
-
Feb 2007
Remove existing awning framing that faces polk street. terminate electrical connections. no new replacment.
-
Mar 2007
Remove the existing duct work @ ceiling. remove the mezzanine. remove portion of rear wall.install new wall @ rear of space. comply with his nov#200446763.
-
Mar 2014
Complying with ord 029-13 installing grab bars in public bathrooms.
-
May 2014
Install atm machine in interior wall.
-
Jan 2019
Residential. compliance with mandatory seismic retrofit program per sfebc chapter 4d & 2016 cebc appx a-4. comply with nov #201803503.
-
Jan 2019
Commercial. compliance with mandatory seismic retrofit program per sfebc chapter 4d & 2016 cebc appx a-4. comply with nov #201803503.
-
Feb 2021
Modify existing drain to a commercial drain. change use from retail to limited restaurant. add 2 new sink/add electric water heater.
-
Dec 2022
Ref- complaint# 202293573: repair existing damage non- bearing wall and ceiling.
-
Jul 2023
Ti to existing retail space including: install power door operator per information sheets da-05 to provide accessible entry, reconfigure existing bathroom to be accessible, install new lighting, no residential guest rooms will be removed converted or demolished.
-
Aug 2023
Tenant improvement to existing retail space including reconfigure existing bathroom to be accessible. install accessible cash wrap counter. install new lighting.
-
Jan 2024
Install (1) non electric, non illuminated sign "muse juice bar".
-
Sep 2024
One unit: to comply with nov 202421330 item 7. drywall repair due fire burn.
-
Jan 2025
Replace existing fire alarm system witn new fire alarm system to comply with sffd 1103.7.6.1.
-
Dec 2025
To comply with nov # 202545128: one unit - install grab bars outside of shower. item #4.