1940 Sacramento Street, Unit 1
Condominium unit
-
Jan 1982
Additions alterations or repairs.
-
Aug 1990
Repair plaster damage at west side of lobby.
-
Sep 1990
Open up 66 inches of load bearing wall & install headers.
-
Dec 1992
Replace existing cabinets with more modern cabinets.
-
Feb 1994
Dry rot and termite repair.
-
Jun 1994
Remodel kitchen and bathroom accoording to drawings.
-
Feb 2010
Repair ceiling of ocmmon area & garage, existing plaster which is crack & replace in-kind.
-
Jan 2011
Replace sheet rock in hallway in kind, no structural changes, 150 sq ft 2nd floor.
-
Jan 2011
Repair sheetrock in garage. no structural changes. approx 600 sq ft.
-
Mar 2011
Water damage repair in kind to bedroom, bathroom, hallway, living room & dining room, drywall & insulation only. 1500 sq ft. soft demolition, non structural. field inspector to verify.
-
Nov 2016
#1 upgrade electrical installation throughout unit, lighting fixtures w led. din rm remove closets on western wall, rmv swinging door to kitchen, relocate atrium door to west wall.opening to kitchen, full bath: vanity cntr w sink, remove tuv, master clst into shwr.atrium clst into bedrm access, remove access.
-
Jul 2017
Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. retrofit includes plywood shear walls and simpson strong-tie frame system at the first story. some existing concrete foundations are modified at lateral force resisting system locations.
-
Mar 2023
One unit: remodel 2 bathroosm. convert tub to shower in the master. in the guest remove a non load bearing wall.
5 nominal $1 street-space or sidewalk permits are omitted from the timeline. 2 expired or cancelled permits are not shown.